Vantage Data Centers — Frontier (Shackelford County, TX)

Vantage Data Centers — Frontier is an announced AI data center campus. 1.40 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · Private land · ERCOT · Albany (Shackelford County), Texas, United States


Capacity: announced vs energized

Announced
1.40 GW
claimed
Contracted
not recorded
Under construction
1.40 GW
reported
Energized
0 GW
reported

Announced-to-energized gap: 1.40 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Vantage Data Centers — Frontier (Shackelford County, TX) capacity claims
Source
Announced1.40 GW2025-08-19claimedpress release
Energized0 GW2026-08-17reportedjournalist report
Under construction1.40 GW2026-01-01reportedjournalist report

The deal

developer
Vantage Data Centers · Owns and builds the campus; backed by DigitalBridge/Silver Lake.
tenant
OpenAI · Confirmed Stargate site; OpenAI is the anchor tenant.
grid operator
ERCOT · Texas grid region; campus designed off-grid via on-site gas.

Power

Power source
behind the meter gas
Grid operator
ERCOT
Interconnection

Frontier behind-the-meter natural gas microgrid (phase 1), 0.70 GW gas, Permitted. ~210 generators, ~700 MW phase-one per TCEQ air-quality registrations; off-grid microgrid to avoid ERCOT queue.

Financial structure

Total announced investment in Frontier
$25B press release