Grid operator
AI data centers on the WECC grid
Every tracked AI data center campus interconnecting to the WECC grid, with combined announced-vs-energized capacity and the grid's live demand. Each figure is individually dated and sourced.
On this grid
Campuses
18
Announced (combined)
29.61 GW
Energized (combined)
0.68 GW
Campuses on this grid
See every campus on the national data center map, browse the full campus index, or read the verified-vs-claimed methodology.