Project Jade (Crusoe / Tallgrass) AI Data Center Campus
Project Jade (Crusoe / Tallgrass) AI Data Center Campus is an announced AI data center campus. 1.80 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Permitted · greenfield · WECC · Cheyenne, Wyoming, United States
Capacity: announced vs energized
Announced-to-energized gap: 1.80 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 1.80 GW | 2025-07-24 | reported | press release |
The deal
- developer
- Crusoe Energy Systems · Develops the AI data center campus
- utility
- Tallgrass Energy · Builds BFC Power / Cheyenne Power Hub and CO2 sequestration hub
Power
- Power source
- behind the meter gas
- Grid operator
- WECC
- Interconnection
BFC Power / Cheyenne Power Hub, 2.70 GW gas, Permitted. 2.7 GW natural gas-fired generation on 659 acres, built by Tallgrass; $7B investment.
Bloom Energy fuel cells, other, Announced. Fuel cells cited in bring-your-own-power model; capacity unspecified.
Sources
- Wyoming Approves Data Center Campus That Includes 2.7 GW of New Natural Gas-Fired Generation
- Crusoe and Tallgrass announce AI data center in Wyoming
8848cb50-2254-4805-99ad-f2236513df2c · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.