Data center campus

Project Jade (Crusoe / Tallgrass) AI Data Center Campus

Project Jade (Crusoe / Tallgrass) AI Data Center Campus is an announced AI data center campus. 1.80 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Permitted · greenfield · WECC · Cheyenne, Wyoming, United States


Capacity: announced vs energized

Announced
1.80 GW
reported
Contracted
not recorded
Under construction
not recorded
Energized
not recorded

Announced-to-energized gap: 1.80 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Project Jade (Crusoe / Tallgrass) AI Data Center Campus capacity claims
Source
Announced1.80 GW2025-07-24reportedpress release

The deal

developer
Crusoe Energy Systems · Develops the AI data center campus
utility
Tallgrass Energy · Builds BFC Power / Cheyenne Power Hub and CO2 sequestration hub

Power

Power source
behind the meter gas
Grid operator
WECC
Interconnection

BFC Power / Cheyenne Power Hub, 2.70 GW gas, Permitted. 2.7 GW natural gas-fired generation on 659 acres, built by Tallgrass; $7B investment.

Bloom Energy fuel cells, other, Announced. Fuel cells cited in bring-your-own-power model; capacity unspecified.

Sources

8848cb50-2254-4805-99ad-f2236513df2c · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.