DEPLOYDatabase

Data center campus

Crusoe Tulsa AI Factory

Crusoe Tulsa AI Factory is a tracked AI data center campus in Tulsa, Oklahoma, USA (first full-scale US metro operation). Retrofit-style AI datacenter used for early GPU cloud capacity before Abilene came online.

Energized · Crusoe · Tulsa, Oklahoma, USA (first full-scale US metro operation)


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Crusoe Tulsa AI Factory capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
15 MW (Reported first phase; initial 15 MW retrofit at existing Tulsa facility)

On the data center map

Every tracked data center is on this map, centered on Crusoe Tulsa AI Factory. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Crusoe

Power

Power source
grid
Interconnection

County water status: Moderate drought (D1) in Tulsa County, week of 2026-08-25 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Crusoe Tulsa AI Factory is in Tulsa, Oklahoma, USA (first full-scale US metro operation). It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

4bda466e-ccd3-4c21-8002-eaae0a91e77e · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Crusoe Tulsa AI Factory?
Crusoe Tulsa AI Factory is an AI data center campus tracked on the DEPLOY registry, located in Tulsa, Oklahoma, USA (first full-scale US metro operation). DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Crusoe Tulsa AI Factory?
Crusoe is recorded as a party to Crusoe Tulsa AI Factory on the DEPLOY registry. The full party list, with each role, is on the record.
Is Crusoe Tulsa AI Factory operating yet?
As of the most recent verification on the DEPLOY registry, Crusoe Tulsa AI Factory is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Crusoe Tulsa AI Factory?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Crusoe Tulsa AI Factory on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Crusoe Tulsa AI Factory: AI data center campus record. Retrieved August 29, 2026, from https://registry.deploy.report/datacenters/crusoe-tulsa-ai-factory

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces