Switch Citadel Campus (Tahoe Reno)

Switch Citadel Campus is an announced AI data center campus. 0.65 GW of capacity has been announced; 0.13 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · Private land · McCarran (Tahoe Reno Industrial Center), Nevada, United States


Capacity: announced vs energized

Announced
0.65 GW
claimed
Contracted
not recorded
Under construction
not recorded
Energized
0.13 GW
reported

Announced-to-energized gap: 0.52 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Switch Citadel Campus (Tahoe Reno) capacity claims
Source
Announced0.65 GW2019-01-01claimedpress release
Energized0.13 GW2019-01-01reportedjournalist report

The deal

developer
Switch, Inc. · Founded/led by Rob Roy
operator
Switch, Inc.
financier
IFM Investors · Co-owner alongside DigitalBridge
utility
NV Energy · Switch litigated utility exit at Nevada PUC
financier
DigitalBridge · Took Switch private in 2022

Power

Power source
grid
Interconnection