DEPLOYDatabase

Data center campus

US West LAS1

US West LAS1 is a tracked AI data center campus in Las Vegas, Nevada, USA.

Energized · CoreWeave · Las Vegas, Nevada, USA


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
US West LAS1 capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

CoreWeave

Developer

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Named tenants
CoreWeave

On the data center map

Every tracked data center is on this map, centered on US West LAS1. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
CoreWeave

Power

Power source
grid
Interconnection

County water status: Severe drought (D2) in Clark County, week of 2026-08-25 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

US West LAS1 is in Las Vegas, Nevada, USA. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

a5cf1451-09ea-4a2b-a9e8-ae6a92d378d9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is US West LAS1?
US West LAS1 is an AI data center campus tracked on the DEPLOY registry, located in Las Vegas, Nevada, USA. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building US West LAS1?
CoreWeave is recorded as a party to US West LAS1 on the DEPLOY registry. The full party list, with each role, is on the record.
Is US West LAS1 operating yet?
As of the most recent verification on the DEPLOY registry, US West LAS1 is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on US West LAS1?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track US West LAS1 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). US West LAS1: AI data center campus record. Retrieved August 30, 2026, from https://registry.deploy.report/datacenters/coreweave-us-west-las1

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces