Data center campus

Chester

Chester is a tracked AI data center campus in Rochester, Minnesota, USA. Richmond metro

Energized · CoreWeave · Rochester, Minnesota, USA


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Chester capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

CoreWeave

Developer

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Named tenants
CoreWeave

On the data center map

Every tracked data center is on this map, centered on Chester. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
CoreWeave

Power

Power source
grid
Interconnection

County water status: Severe drought (D2) in Olmsted County, week of 2026-08-25 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Chester is in Rochester, Minnesota, USA. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

1f7b0be7-0a43-40e1-8f0d-b274c7dfd6ce · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Chester?
Chester is an AI data center campus tracked on the DEPLOY registry, located in Rochester, Minnesota, USA. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Chester?
CoreWeave is recorded as a party to Chester on the DEPLOY registry. The full party list, with each role, is on the record.
Is Chester operating yet?
As of the most recent verification on the DEPLOY registry, Chester is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Chester?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Chester on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Chester: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/coreweave-chester

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces