Data center campus
Kenilworth (NEST)
Kenilworth is a tracked AI data center campus in New Jersey, Union. $1.2B lease of 280,000 sq ft at Northeast Science and Technology Center
Under construction · CoreWeave · Kenilworth, Union, New Jersey, United States
Capacity: announced vs energized
| Source |
|---|
Construction evidence
Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.
Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones synthesized from the campus's own capacity ledger, financial claims, and lifecycle events; each chip links to its source. How we source and verify it: satellite construction evidence.
Per-building manifest tied to the site polygons and imagery. When we know a building's outline we render it; when we know only its year and capacity we still surface those as first-class rows so the campus total is auditable, not a headline claim. Sorted largest-first; top 6 shown by default of 13.
Manifest totals: 1,463,300 sqft. Rolled from the per-building rows above.
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Named tenants
- CoreWeave
- Initial lease / investment (announced)
- Oct 28 2024 CoreWeave signed a long-term lease for the entire ~280,000 sq ft Building 11 NEST at the Northeast Science & Technology Center in Kenilworth, NJ (former Merck campus; Onyx Equities / Machine Investment Group), planning to invest $1.2 billion to convert it into CoreWeave's first New Jersey data center (Onyx / CoreWeave via PR Newswire, Oct 28 2024)
- Utility partner (announced)
- PSE&G is preparing electrical infrastructure for the Kenilworth facility; the announcement cites PSE&G already serving over 30 large data centers in New Jersey (Onyx / CoreWeave via PR Newswire, Oct 28 2024)
- Campus context (announced)
- 11 NEST sits on a 100+ acre, ~2M sq ft campus purpose-built/zoned for life science and data centers after Onyx/Machine/Pivot acquired the former Merck global HQ in Feb 2023 (Onyx / CoreWeave via PR Newswire, Oct 28 2024)
- Purchase / expanded project (local press)
- Local real-estate press reports CoreWeave later purchased 11 NEST plus about 27 adjacent acres for $322M (Aug 2025), and that NJ EDA materials describe a nearly $1.8B / about 250 MW project of roughly 392,600 sq ft (retrofit plus new build) with construction from mid-Sep 2025 and operations targeted early 2027, plus a $250M Next New Jersey AI tax credit. Treat MW, capex, and EDA figures as reported via EDA/press, not a CoreWeave IR release (Real Estate NJ, Nov 25 2025; NJBIZ on acquisition)
On the data center map
Every tracked data center is on this map, centered on Kenilworth. Pan or zoom out to see how close rivals are building.
In clusterUnion(5)·New Jersey(88)
The deal
- developer
- CoreWeave
Power
- Power source
- grid
- Interconnection
County water status: No drought in Union County, week of 2026-10-06 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Kenilworth is in New Jersey, Union. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Facilities at this campus
Sources
- Kenilworth (NEST) — coreweave facility
- CoreWeave Signs 280,000 SF Lease at NEST Center in Kenilworth
- CoreWeave begins $1.8 billion data center project in Kenilworth
- CoreWeave acquires NEST data center from Onyx JV for $322M
2ef2e9ff-9dee-4eac-b45f-6405de5e677e · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Kenilworth (NEST)?
Who is building Kenilworth (NEST)?
Is Kenilworth (NEST) operating yet?
How verified is the data on Kenilworth (NEST)?
Deploy Watch
Track Kenilworth (NEST) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Kenilworth (NEST): AI data center campus record. Retrieved October 12, 2026, from https://registry.deploy.report/datacenters/coreweave-kenilworth
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/coreweave-kenilworth.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/coreweave-kenilworth
- Data documentation: /data
- Query this programmatically: Deploy MCP