Data center campus
Polaris Forge 1 Building 2
Polaris Forge 1 Building 2 is a tracked AI data center campus in North Dakota, Ellendale.
Under construction · CoreWeave · Ellendale, North Dakota, United States
Capacity: announced vs energized
Expected online: second half of 2026 (next phase). 1 month away..
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Named tenants
- CoreWeave
On the data center map
Every tracked data center is on this map, centered on Polaris Forge 1 Building 2. Pan or zoom out to see how close rivals are building.
- Grid
- due 2026
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterNorth Dakota(24)
The deal
- developer
- CoreWeave
Power
- Power source
- grid
- Interconnection
County water status: Moderate drought (D1) in Dickey County, week of 2026-11-24 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Polaris Forge 1 Building 2 is in North Dakota, Ellendale. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026energization date changedintake proposal 74c9cd6d-8710-4a9b-85d1-78d20551b02e
- Nov 2026Current: Under construction
Sources
- Polaris Forge 1 Building 2 — coreweave facility
- Applied Digital Announces 250MW AI Data Center Lease With CoreWeave in North Dakota · Applied Digital
01eb8d14-ef60-447f-8376-bb8eee3c3da7 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Polaris Forge 1 Building 2?
Who is building Polaris Forge 1 Building 2?
Is Polaris Forge 1 Building 2 operating yet?
How verified is the data on Polaris Forge 1 Building 2?
Deploy Watch
Track Polaris Forge 1 Building 2 on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Polaris Forge 1 Building 2: AI data center campus record. Retrieved November 26, 2026, from https://registry.deploy.report/datacenters/coreweave-polaris-forge-1-building-2
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/coreweave-polaris-forge-1-building-2.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/coreweave-polaris-forge-1-building-2
- Data documentation: /data
- Query this programmatically: Deploy MCP