Data center campus

Polaris Forge 1 (Ellendale)

Polaris Forge 1 is an announced AI data center campus. 1 GW of capacity has been announced; 0.17 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · greenfield · MISO · Ellendale, North Dakota, United States


Capacity: announced vs energized

Announced
1 GW
claimed
Contracted
0.40 GW
verified
Under construction
not recorded
Energized
0.17 GW
claimed

Announced-to-energized gap: 0.82 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Polaris Forge 1 (Ellendale) capacity claims
Source
Announced1 GW2025-08-30claimedpress release
Contracted0.40 GW2026-05-31verifiedsec filing
Energized0.17 GW2026-07-01claimedpress release

The deal

developer
Applied Digital Corporation · NASDAQ: APLD
operator
Applied Digital Corporation
offtaker
CoreWeave · 15-year take-or-pay leases, 400 MW
utility
Otter Tail Power (MISO)

Power

Power source
grid
Grid operator
MISO
Interconnection

Jamestown-to-Ellendale 345 kV line (MISO Tranche 1), grid interconnect, Under construction. 345 kV transmission upgrade supporting ND data-center load; not a generation project