Data center campus
Delta Forge 2
Delta Forge 2 is a tracked AI data center campus in Alabama, Tuscaloosa. Applied Digital's fifth AI Factory campus (Delta Forge 2): 210 MW critical IT leased to an unnamed U.S. high investment-grade hyperscaler under a 15-year take-or-pay structure. Company IR (Jun 8, 2026) locates the campus
Announced · Applied Digital · Brookwood, Tuscaloosa, Alabama, United States
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Critical IT (contracted)
- 210 MW under a 15-year take-or-pay lease (Applied Digital IR, Jun 8 2026)
- Tenant
- Unnamed U.S. high investment-grade hyperscaler (company disclosure; not CoreWeave)
- Location
- Company IR: "new southern state." Local/trade press report Brookwood, Tuscaloosa County, Alabama (DCD; al.com)
- Contracted revenue (base term)
- Approximately $5.2B base-term contracted revenue ($12.7B if all renewal options exercised over a 30-year total term) (Applied Digital IR)
- Initial operations (targeted)
- Q1 2028 (Applied Digital IR)
- Not Polaris Forge 2
- Polaris Forge 2 is the separate Harwood, ND campus (applied-digital-harwood-north-dakota). Ellendale is Polaris Forge 1 (applied-digital-ellendale-north-dakota).
On the data center map
Every tracked data center is on this map, centered on Delta Forge 2. Pan or zoom out to see how close rivals are building.
In clusterTuscaloosa(4)·Alabama(36)
The deal
- developer
- Applied Digital
- offtaker
- Unnamed U.S. high investment-grade hyperscaler
Power
- Power source
- grid
- Interconnection
County water status: Severe drought (D2) in Tuscaloosa County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Delta Forge 2 is in Alabama, Tuscaloosa. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
- Applied Digital Signs 210 MW Lease at Delta Forge 2
- Applied Digital reveals $3.2bn Delta Forge 2 AI data center will be built in Alabama · Data Center Dynamics
- Applied Digital confirms $3.2B hyperscale AI factory for Brookwood · al.com
9296361c-cc72-45d3-af78-92a1b47e790f · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Delta Forge 2?
Who is building Delta Forge 2?
Is Delta Forge 2 operating yet?
How verified is the data on Delta Forge 2?
Deploy Watch
Track Delta Forge 2 on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Delta Forge 2: AI data center campus record. Retrieved September 28, 2026, from https://registry.deploy.report/datacenters/applied-digital-delta-forge-2
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/applied-digital-delta-forge-2.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/applied-digital-delta-forge-2
- Data documentation: /data
- Query this programmatically: Deploy MCP