Polaris Forge 2 (Harwood)

Polaris Forge 2 is an announced AI data center campus. 0.28 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · greenfield · MISO · Harwood, North Dakota, United States


Capacity: announced vs energized

Announced
0.28 GW
claimed
Contracted
0.20 GW
claimed
Under construction
0.28 GW
verified
Energized
not recorded

Announced-to-energized gap: 0.28 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Polaris Forge 2 (Harwood) capacity claims
Source
Announced0.28 GW2025-08-18claimedpress release
Contracted0.20 GW2025-09-01claimedpress release
Under construction0.28 GW2026-05-31verifiedsec filing

The deal

developer
Applied Digital Corporation · NASDAQ: APLD
offtaker
Undisclosed U.S. investment-grade hyperscaler · 200 MW leased; ROFR on 800 MW
utility
Minnkota Power Cooperative (MISO)
financier
Macquarie Asset Management · Perpetual-preferred financing draws

Power

Power source
grid
Grid operator
MISO
Interconnection

Harwood substation and high-voltage line (Minnkota Power), 0.28 GW grid interconnect, Under construction. ~$75M in upgrades funded by APLD, owned/operated by Minnkota Power Cooperative

Sources

76e69d68-aa5f-4f30-bb67-e5e3acf391d4 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.