Data center campus
Jamestown HPC Campus
Jamestown HPC Campus is a tracked AI data center campus in North Dakota, Stutsman County. Planned HPC campus in Jamestown ND alongside Ellendale build-out.
Announced · Applied Digital · Jamestown, Stutsman County, North Dakota, United States
Capacity: announced vs energized
Expected online: 2023 (next phase). 35 months past the claimed date, with no energized capacity on record..
| Source |
|---|
Key facts
On the data center map
Every tracked data center is on this map, centered on Jamestown HPC Campus. Pan or zoom out to see how close rivals are building.
- Grid
- due 2023
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterStutsman County(4)·North Dakota(24)
The deal
- developer
- Applied Digital
Power
- Power source
- grid
- Interconnection
County water status: Abnormally dry (D0) in Stutsman County, week of 2026-11-10 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Jamestown HPC Campus is in North Dakota, Stutsman County. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document. 1 permit on file with ND DEQ: 1 wastewater permit.
Facilities at this campus
Timeline
- Nov 2026permit status changedND DEQ ND0027073: unknown to active (agency record, 2026-11-18)
- Nov 2026Current: Announced
Sources
- Jamestown HPC Campus — applied-digital facility
- Applied Digital Announces Successful Integrated Systems Test at Jamestown, North Dakota Facility for HPC Deployment · Applied Digital via GlobeNewswire/Yahoo Finance
6a8731eb-d088-491c-818f-511080566f74 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Jamestown HPC Campus?
Who is building Jamestown HPC Campus?
Is Jamestown HPC Campus operating yet?
How verified is the data on Jamestown HPC Campus?
Deploy Watch
Track Jamestown HPC Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Jamestown HPC Campus: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/applied-digital-jamestown-hpc-campus
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/applied-digital-jamestown-hpc-campus.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/applied-digital-jamestown-hpc-campus
- Data documentation: /data
- Query this programmatically: Deploy MCP