DEPLOYDatabase

Data center comparison

US West LAS1 vs Switch Citadel Campus

Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.


Side by side

US West LAS1Switch Citadel Campus
Announced capacitynot recorded0.65 GW
Energized capacitynot recorded0.13 GW
Announced-to-energized gapnot recorded0.52 GW
Lifecycleenergizedpartially energized
DeveloperCoreWeaveSwitch, Inc.
LocationLas Vegas, Nevada, United StatesMcCarran (Tahoe Reno Industrial Center), Nevada, United States
Gridnot recordedWECC
Acreagenot recorded2,000 acres

On the map

Common questions

Which is further along, US West LAS1 or Switch Citadel Campus?
US West LAS1 is energized; Switch Citadel Campus is partially energized. Energized capacity: not recorded versus 0.13 GW. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are US West LAS1 and Switch Citadel Campus?
US West LAS1 is in Las Vegas, Nevada, United States; Switch Citadel Campus is in McCarran (Tahoe Reno Industrial Center), Nevada, United States. Each record on DEPLOY is sourced and dated.

Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.