DEPLOYDatabase

Data center campus

Tract Master-Planned Data Center Park (TRIC)

Tract has assembled 2,200+ acres (part of a broader ~8,590-acre position) at the Tahoe-Reno Industrial Center in Storey County, positioned as master-planned data center land for hyperscalers, with an NV Energy relationship framed around del

Announced · greenfield · WECC · Storey County, Nevada, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
2 GW
claimed
Under construction
not recorded
Energized
not recorded
Tract Master-Planned Data Center Park (TRIC) capacity claims
Source
Contracted2 GW2023-10-02claimedpress release

The deal

developer
Tract (Tract Capital) · Master-planned data center land developer
utility
NV Energy · WECC; permanent power provider

Power

Power source
mixed
Grid operator
WECC
Interconnection

South Valley temporary gas plant, 0.14 GW gas, Announced. Air-quality permit application filed ~2026-04-20; temporary 2-3 yr bridge.

Peru Ridge temporary gas plant, 0.22 GW gas, Announced. Air-quality/state energy-regulator application; construction targeted 2027.

Sources

79dc4d14-f2b6-4caf-b4d9-2620039c6a94 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.