Data center campus
Tract Master-Planned Data Center Park (TRIC)
Tract Master-Planned Data Center Park is a tracked AI data center campus in Nevada, Storey County. Tract has assembled 2,200+ acres (part of a broader ~8,590-acre position) at the Tahoe-Reno Industrial Center in Storey County, positioned as master-planned data center land for hyperscalers, with an NV Energy relationsh
Announced · Tract (Tract Capital) · greenfield · WECC · Storey County, Nevada, United States
Capacity: announced vs energized
Promised online: 2026. 3 months away. Claimed by Tract / NV Energy (source).
| Source | ||||
|---|---|---|---|---|
| Contracted | 2 GW | 2023-10-02 | claimed | press release |
| Under construction | 0.40 GW | 2026-05-01 | reported | journalist report |
Key facts
Lifecycle
Energized
Tract (Tract Capital)
Developer
Location
Grid
Land
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- 2,200+ acres Peru Shelf + South Valley (primary)
- On Oct 2, 2023, Tract announced via GlobeNewswire acquisition of more than 2,200 acres inside the Tahoe-Reno Industrial Center (TRI) in Storey County, Nevada, comprising areas commonly called Peru Shelf and South Valley, for master-planned data center park development (GlobeNewswire / Tract, Oct 2 2023)
- NV Energy 2 GW+ / power from 2026 (primary)
- Tract's Oct 2023 release states commitments from NV Energy to deliver over two gigawatts of power beginning in 2026, and quotes NV Energy President and CEO Doug Cannon on partnering for long-range planning so reliable power can be delivered to the two Tract sites. Treat the 2 GW+ figure as the stated utility commitment / planning target in that release, not as energized load (GlobeNewswire / Tract, Oct 2 2023)
- 1,100+ acre-feet water rights (primary)
- Alongside the land purchase, Tract stated it controls over 1,100 acre-feet of water rights for the Storey County TRI sites (GlobeNewswire / Tract, Oct 2 2023)
- Master-planned shovel-ready framing (primary)
- Tract CEO Grant van Rooyen, quoted in the Oct 2023 release, frames the campuses as master-planned and shovel-ready so hyperscale customers can gain speed and certainty from Tract's entitlements and infrastructure investments at TRI. Named end tenants and vertical construction starts are not disclosed in this primary release (GlobeNewswire / Tract, Oct 2 2023)
On the data center map
Every tracked data center is on this map, centered on Tract Master-Planned Data Center Park. Pan or zoom out to see how close rivals are building.
- Announced capex
- $10B
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterNevada(65)
The deal
- developer
- Tract (Tract Capital) · Master-planned data center land developer
- utility
- NV Energy · WECC; permanent power provider
- developer
- Fleet Data Centers · Subsidiary of Tract Capital Management; developing South Valley and Peru Ridge campuses
Power
- Power source
- mixed
- Grid operator
- WECC
- Interconnection
- Water
- Tract controls over 1,100 acre-feet of water rights at TRIC
South Valley temporary gas plant, 0.14 GW gas, Announced. Air-quality permit application filed ~2026-04-20; temporary 2-3 yr bridge.
Peru Ridge temporary gas plant, 0.22 GW gas, Announced. Air-quality/state energy-regulator application; construction targeted 2027.
County water status: Moderate drought (D1) in Storey County, week of 2026-09-29 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Tract Master-Planned Data Center Park sits on greenfield in Nevada, Storey County. It connects to the WECC grid, draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Fleet Data Centers construction (South Valley + Peru Ridge)
- $10B journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Aug 2026party addeddeveloper: Fleet Data Centers
- Oct 2026Current: Announced
Sources
- Tract Completes Acquisition of 2,200 Acres in Storey County, Nevada and Partners with NV Energy to Deliver Two Gigawatts of Power Capacity
- Why a Northern Nevada data center wants to build its own temporary natural gas power plant
- Tract Completes Acquisition of 2,200 Acres in Storey County, Nevada and Partners with NV Energy to Deliver Two Gigawatts of Power Capacity
79dc4d14-f2b6-4caf-b4d9-2620039c6a94 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Tract Master-Planned Data Center Park (TRIC)?
Who is building Tract Master-Planned Data Center Park (TRIC)?
Is Tract Master-Planned Data Center Park (TRIC) operating yet?
How verified is the data on Tract Master-Planned Data Center Park (TRIC)?
Deploy Watch
Track Tract Master-Planned Data Center Park (TRIC) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Tract Master-Planned Data Center Park (TRIC): AI data center campus record. Retrieved October 2, 2026, from https://registry.deploy.report/datacenters/tract-tric-storey-county-nevada
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/tract-tric-storey-county-nevada.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/tract-tric-storey-county-nevada
- Data documentation: /data
- Query this programmatically: Deploy MCP