Data center campus
Tract Master-Planned Data Center Park (TRIC)
Tract has assembled 2,200+ acres (part of a broader ~8,590-acre position) at the Tahoe-Reno Industrial Center in Storey County, positioned as master-planned data center land for hyperscalers, with an NV Energy relationship framed around del
Announced · greenfield · WECC · Storey County, Nevada, United States
Capacity: announced vs energized
Announced
not recorded
Contracted
2 GW
claimed
Under construction
not recorded
Energized
not recorded
| Source | ||||
|---|---|---|---|---|
| Contracted | 2 GW | 2023-10-02 | claimed | press release |
The deal
- developer
- Tract (Tract Capital) · Master-planned data center land developer
- utility
- NV Energy · WECC; permanent power provider
Power
- Power source
- mixed
- Grid operator
- WECC
- Interconnection
South Valley temporary gas plant, 0.14 GW gas, Announced. Air-quality permit application filed ~2026-04-20; temporary 2-3 yr bridge.
Peru Ridge temporary gas plant, 0.22 GW gas, Announced. Air-quality/state energy-regulator application; construction targeted 2027.
Sources
- Tract Completes Acquisition of 2,200 Acres in Storey County, Nevada and Partners with NV Energy to Deliver Two Gigawatts of Power Capacity
- Why a Northern Nevada data center wants to build its own temporary natural gas power plant
79dc4d14-f2b6-4caf-b4d9-2620039c6a94 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.