Data center campus
Voltage Park Reno
Voltage Park Reno is a tracked AI data center campus in Nevada, McCarran (Tahoe Reno Industrial Center). One of six Tier 3+ sites named in company materials
Energized · Voltage Park · McCarran (Tahoe Reno Industrial Center), Nevada, United States
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Operator portfolio (claimed)
- Voltage Park states six Tier 3+ US data centers across four states and about 24,000 NVIDIA HGX H100 GPUs (Voltage Park infrastructure; about)
- Hardware (claimed)
- NVIDIA HGX H100 on Dell PowerEdge XE9680 servers; InfiniBand fabric up to 3200 Gbps (Voltage Park infrastructure)
- City naming (HOLD)
- Current public Voltage Park infrastructure/about pages do not list Reno, Dallas, Ashburn, or Chicago by name. This campus row retains the city label from prior registry notes pending a primary city roster.
On the data center map
No mappable coordinate is recorded for Voltage Park Reno yet. Location: McCarran (Tahoe Reno Industrial Center).
In clusterNevada(65)
The deal
- developer
- Voltage Park
Power
- Power source
- grid
- Interconnection
Why here
Voltage Park Reno is in Nevada, McCarran (Tahoe Reno Industrial Center). It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
355ab37b-2717-4293-8840-d8815c2877bb · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Voltage Park Reno?
Who is building Voltage Park Reno?
Is Voltage Park Reno operating yet?
How verified is the data on Voltage Park Reno?
Deploy Watch
Track Voltage Park Reno on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Voltage Park Reno: AI data center campus record. Retrieved October 12, 2026, from https://registry.deploy.report/datacenters/voltage-park-reno
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/voltage-park-reno.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/voltage-park-reno
- Data documentation: /data
- Query this programmatically: Deploy MCP