DEPLOYDatabase

Data center campus

Voltage Park Reno

Voltage Park Reno is a tracked AI data center campus in Nevada, McCarran (Tahoe Reno Industrial Center). One of six Tier 3+ sites named in company materials

Energized · Voltage Park · McCarran (Tahoe Reno Industrial Center), Nevada, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Voltage Park Reno capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Voltage Park

Developer

On the data center map

No mappable coordinate is recorded for Voltage Park Reno yet. Location: McCarran (Tahoe Reno Industrial Center).

In clusterNevada(65)

The deal

developer
Voltage Park

Power

Power source
grid
Interconnection

Why here

Voltage Park Reno is in Nevada, McCarran (Tahoe Reno Industrial Center). It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Sources

355ab37b-2717-4293-8840-d8815c2877bb · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Voltage Park Reno?
Voltage Park Reno is an AI data center campus tracked on the DEPLOY registry, located in McCarran (Tahoe Reno Industrial Center). DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Voltage Park Reno?
Voltage Park is recorded as a party to Voltage Park Reno on the DEPLOY registry. The full party list, with each role, is on the record.
Is Voltage Park Reno operating yet?
As of the most recent verification on the DEPLOY registry, Voltage Park Reno is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Voltage Park Reno?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Voltage Park Reno on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Voltage Park Reno: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/voltage-park-reno

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces