EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)

EdgeCore Reno Data Center Campus is an AI data center campus developed by EdgeCore Digital Infrastructure in Nevada, Reno. 0.22 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · EdgeCore Digital Infrastructure · Reno, Nevada, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.22 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) capacity claims
Source
Announced0.22 GW2026-11-20claimedpress release

Key facts

0.22 GW

Announced

0 GW

Energized

0.22 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on EdgeCore Reno Data Center Campus. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.

In clusterNevada(68)

The deal

Power

Interconnection

County water status: Moderate drought (D1) in Washoe County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

EdgeCore Reno Data Center Campus is in Nevada, Reno. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Timeline

  1. Nov 2026
    capacity changed
    announced: unknown to 0.216
  2. Nov 2026
    Current: Partially energized

Sources

723b1b3b-1564-4932-acea-7c32d83bc2c2 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)?
EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) is an AI data center campus tracked on the DEPLOY registry, located in Reno. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) use?
EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) has 0.22 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)?
EdgeCore Digital Infrastructure is recorded as a party to EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) on the DEPLOY registry. The full party list, with each role, is on the record.
Is EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) operating yet?
As of the most recent verification on the DEPLOY registry, EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center): AI data center campus record. Retrieved November 21, 2026, from https://registry.deploy.report/datacenters/edgecore-reno-data-center-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces