Data center campus
EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)
EdgeCore Reno Data Center Campus is an AI data center campus developed by EdgeCore Digital Infrastructure in Nevada, Reno. 0.22 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · EdgeCore Digital Infrastructure · Reno, Nevada, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.22 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.22 GW | 2026-11-20 | claimed | press release |
Key facts
Lifecycle
Announced
Energized
EdgeCore Digital Infrastructure
Developer
Location
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on EdgeCore Reno Data Center Campus. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
In clusterNevada(68)
The deal
- developer
- EdgeCore Digital Infrastructure
- operator
- EdgeCore Digital Infrastructure
Power
- Interconnection
County water status: Moderate drought (D1) in Washoe County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
EdgeCore Reno Data Center Campus is in Nevada, Reno. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026capacity changedannounced: unknown to 0.216
- Nov 2026Current: Partially energized
Sources
- Reno Data Centers · EdgeCore
- EdgeCore Launches First Facility and Completes Structural Milestone at Second Data Center in 216 MW Reno Campus, Nevada · US Data Center Projects
723b1b3b-1564-4932-acea-7c32d83bc2c2 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)?
How much power will EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) use?
Who is building EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)?
Is EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) operating yet?
How verified is the data on EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)?
Deploy Watch
Track EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center): AI data center campus record. Retrieved November 21, 2026, from https://registry.deploy.report/datacenters/edgecore-reno-data-center-campus
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/edgecore-reno-data-center-campus.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/edgecore-reno-data-center-campus
- Data documentation: /data
- Query this programmatically: Deploy MCP