DEPLOYDatabase

Data center campus

Voltage Park Ashburn

Voltage Park Ashburn is a tracked AI data center campus in Ashburn, Virginia, USA. East-coast H100 pod, part of the 6-DC / 4-state footprint

Energized · Voltage Park · Ashburn, Virginia, USA


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Voltage Park Ashburn capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Voltage Park

Developer

On the data center map

Every tracked data center is on this map, centered on Voltage Park Ashburn. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Voltage Park

Power

Power source
grid
Interconnection

County water status: Moderate drought (D1) in Loudoun County, week of 2026-08-25 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Voltage Park Ashburn is in Ashburn, Virginia, USA. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

7a2e5832-8d23-49ea-b73f-d9eedfb3fcb4 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Voltage Park Ashburn?
Voltage Park Ashburn is an AI data center campus tracked on the DEPLOY registry, located in Ashburn, Virginia, USA. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Voltage Park Ashburn?
Voltage Park is recorded as a party to Voltage Park Ashburn on the DEPLOY registry. The full party list, with each role, is on the record.
Is Voltage Park Ashburn operating yet?
As of the most recent verification on the DEPLOY registry, Voltage Park Ashburn is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Voltage Park Ashburn?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Voltage Park Ashburn on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Voltage Park Ashburn: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/voltage-park-ashburn

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces