Data center campus

PowerHouse 95 (Spotsylvania) Campus

PowerHouse 95 (Spotsylvania) Campus is an announced AI data center campus. 0.80 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · greenfield · PJM · Spotsylvania County, Virginia, United States


Capacity: announced vs energized

Announced
0.80 GW
reported
Contracted
not recorded
Under construction
0.30 GW
reported
Energized
not recorded

Announced-to-energized gap: 0.80 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

PowerHouse 95 (Spotsylvania) Campus capacity claims
Source
Announced0.80 GW2024-01-01reportedjournalist report
Under construction0.30 GW2025-10-01reportedjournalist report

The deal

financier
Harrison Street · Equity partner
utility
Dominion Energy · PJM interconnection
developer
PowerHouse Data Centers · Division of American Real Estate Partners (AREP)

Power

Power source
grid
Grid operator
PJM
Interconnection

Three 300MW utility substations, 0.90 GW grid interconnect, Permitted. Dominion/PJM interconnection via county-approved SUP

Sources

329e5c3e-67ac-40a4-80bb-61e67065a8f4 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.