Data center comparison
PowerHouse 95 (Spotsylvania) Campus vs PowerHouse Circle T Campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| PowerHouse 95 (Spotsylvania) Campus | PowerHouse Circle T Campus | |
|---|---|---|
| Announced capacity | 0.80 GW | 0.30 GW |
| Energized capacity | not recorded | not recorded |
| Announced-to-energized gap | 0.80 GW | 0.30 GW |
| Lifecycle | under construction | permitted |
| Developer | PowerHouse Data Centers | PowerHouse Data Centers |
| Location | Spotsylvania County, Virginia, United States | Westlake, Tarrant, Texas, United States |
| Grid | PJM | not recorded |
| Acreage | 145 acres | 87.96 acres |
On the map
Common questions
Which is bigger, PowerHouse 95 (Spotsylvania) Campus or PowerHouse Circle T Campus?
By announced capacity, PowerHouse 95 (Spotsylvania) Campus is larger: 0.80 GW versus 0.30 GW. Announced figures are claims, not built capacity.
Which is further along, PowerHouse 95 (Spotsylvania) Campus or PowerHouse Circle T Campus?
PowerHouse 95 (Spotsylvania) Campus is under construction; PowerHouse Circle T Campus is permitted. Energized capacity: not recorded versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are PowerHouse 95 (Spotsylvania) Campus and PowerHouse Circle T Campus?
PowerHouse 95 (Spotsylvania) Campus is in Spotsylvania County, Virginia, United States; PowerHouse Circle T Campus is in Westlake, Tarrant, Texas, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.