Data center campus
PowerHouse Circle T Campus
PowerHouse Circle T Campus is an AI data center campus developed by PowerHouse Data Centers in Texas, Tarrant. 0.30 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Permitted · PowerHouse Data Centers · Westlake, Tarrant, Texas, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.30 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.30 GW | 2026-08-04 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
PowerHouse Data Centers
Developer
Location
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on PowerHouse Circle T Campus. Pan or zoom out to see how close rivals are building.
- Land owner
- Circle T Owner LP
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterTexas(611)
The deal
- developer
- PowerHouse Data Centers
- land owner
- Circle T Owner LP
Power
- Interconnection
County water status: Severe drought (D2) in Denton County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
PowerHouse Circle T Campus is in Texas, Tarrant. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026capacity changedannounced: unknown to 0.3
- Nov 2026Current: Permitted
Sources
- Data center plans move forward after Keller, Westlake settlement · Community Impact
- Westlake Planning & Zoning Commission approves data center site plan near Keller · Community Impact
eac27348-42a7-481a-9e22-105524d8adfb · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is PowerHouse Circle T Campus?
How much power will PowerHouse Circle T Campus use?
Who is building PowerHouse Circle T Campus?
Is PowerHouse Circle T Campus operating yet?
How verified is the data on PowerHouse Circle T Campus?
Deploy Watch
Track PowerHouse Circle T Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). PowerHouse Circle T Campus: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/powerhouse-circle-t-campus
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/powerhouse-circle-t-campus.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/powerhouse-circle-t-campus
- Data documentation: /data
- Query this programmatically: Deploy MCP