Data center campus

PowerHouse Circle T Campus

PowerHouse Circle T Campus is an AI data center campus developed by PowerHouse Data Centers in Texas, Tarrant. 0.30 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Permitted · PowerHouse Data Centers · Westlake, Tarrant, Texas, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.30 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

PowerHouse Circle T Campus capacity claims
Source
Announced0.30 GW2026-08-04reportedjournalist report

Key facts

permitted

Lifecycle

0.30 GW

Announced

0 GW

Energized

PowerHouse Data Centers

Developer

0.30 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on PowerHouse Circle T Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of PowerHouse Circle T Campus
Land owner
Circle T Owner LP

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterTexas(611)

The deal

developer
PowerHouse Data Centers
land owner
Circle T Owner LP

Power

Interconnection

County water status: Severe drought (D2) in Denton County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

PowerHouse Circle T Campus is in Texas, Tarrant. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.

Timeline

  1. Nov 2026
    capacity changed
    announced: unknown to 0.3
  2. Nov 2026
    Current: Permitted

Sources

eac27348-42a7-481a-9e22-105524d8adfb · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is PowerHouse Circle T Campus?
PowerHouse Circle T Campus is an AI data center campus tracked on the DEPLOY registry, located in Westlake. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will PowerHouse Circle T Campus use?
PowerHouse Circle T Campus has 0.30 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building PowerHouse Circle T Campus?
PowerHouse Data Centers is recorded as a party to PowerHouse Circle T Campus on the DEPLOY registry.
Is PowerHouse Circle T Campus operating yet?
As of the most recent verification on the DEPLOY registry, PowerHouse Circle T Campus is permitted. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on PowerHouse Circle T Campus?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track PowerHouse Circle T Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). PowerHouse Circle T Campus: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/powerhouse-circle-t-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.