Data center comparison
Fermi America HyperGrid vs PowerHouse Circle T Campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Fermi America HyperGrid | PowerHouse Circle T Campus | |
|---|---|---|
| Announced capacity | 11 GW | 0.30 GW |
| Energized capacity | 0 GW | not recorded |
| Announced-to-energized gap | 11 GW | 0.30 GW |
| Lifecycle | under construction | permitted |
| Developer | Fermi America (Fermi Inc) | PowerHouse Data Centers |
| Location | Amarillo, Texas, United States | Westlake, Tarrant, Texas, United States |
| Grid | SPP | not recorded |
| Acreage | not recorded | 87.96 acres |
On the map
Common questions
Which is bigger, Fermi America HyperGrid or PowerHouse Circle T Campus?
By announced capacity, Fermi America HyperGrid is larger: 11 GW versus 0.30 GW. Announced figures are claims, not built capacity.
Which is further along, Fermi America HyperGrid or PowerHouse Circle T Campus?
Fermi America HyperGrid is under construction; PowerHouse Circle T Campus is permitted. Energized capacity: 0 GW versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Fermi America HyperGrid and PowerHouse Circle T Campus?
Fermi America HyperGrid is in Amarillo, Texas, United States; PowerHouse Circle T Campus is in Westlake, Tarrant, Texas, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.