Data center campus

Crossroads Technology Campus (Spotsylvania County)

Crossroads Technology Campus is an AI data center campus developed by Kettler in Virginia. 0.89 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Permitted · Kettler · greenfield · Virginia, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.89 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Crossroads Technology Campus (Spotsylvania County) capacity claims
Source
Announced0.89 GW2026-11-18claimedjournalist report

Key facts

permitted

Lifecycle

0.89 GW

Announced

0 GW

Energized

Kettler

Developer

0.89 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Crossroads Technology Campus. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a county-level coordinate for this campus, not a verified site coordinate, so the marker shows the county rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.

In clusterVirginia(343)

The deal

developer
Kettler

Power

Interconnection

County water status: Moderate drought (D1) in Buckingham County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Crossroads Technology Campus sits on greenfield in Virginia. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Developer-described campus investment
$8B journalist report

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States

Timeline

  1. Nov 2026
    financial recorded
    investment: Developer-described campus investment
  2. Nov 2026
    Current: Permitted

Sources

93ed4ed2-069f-4980-92d3-bd07f33792d7 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Crossroads Technology Campus (Spotsylvania County)?
Crossroads Technology Campus (Spotsylvania County) is an AI data center campus tracked on the DEPLOY registry, located in Virginia. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Crossroads Technology Campus (Spotsylvania County) use?
Crossroads Technology Campus (Spotsylvania County) has 0.89 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Crossroads Technology Campus (Spotsylvania County)?
Kettler is recorded as a party to Crossroads Technology Campus (Spotsylvania County) on the DEPLOY registry.
Is Crossroads Technology Campus (Spotsylvania County) operating yet?
As of the most recent verification on the DEPLOY registry, Crossroads Technology Campus (Spotsylvania County) is permitted. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Crossroads Technology Campus (Spotsylvania County)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Crossroads Technology Campus (Spotsylvania County) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Crossroads Technology Campus (Spotsylvania County): AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/kettler-crossroads-technology-campus-spotsylvania

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces