Data center campus
STACK Stafford Technology Campus
STACK Stafford Technology Campus is an announced AI data center campus. 1.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Permitted · greenfield · PJM · Stafford, Virginia, United States
Capacity: announced vs energized
Announced
1.10 GW
reported
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Announced-to-energized gap: 1.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 1.10 GW | 2025-01-16 | reported | press release |
The deal
- developer
- STACK Infrastructure
- utility
- Dominion Energy · six 300 MW substations committed
Power
- Power source
- grid
- Grid operator
- PJM
- Interconnection
Sources
- STACK Infrastructure Announces Landmark 1+GW Stafford Technology Campus in Northern Virginia
- Data Centers (official county tracker)
01bdc2de-ec3c-4d49-ab28-d2032658ed62 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.