Data center campus
STACK Stafford Technology Campus
STACK Stafford Technology Campus is an AI data center campus developed by STACK Infrastructure in Virginia, Stafford. 1.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Permitted · STACK Infrastructure · greenfield · PJM · Stafford, Virginia, United States
Capacity: announced vs energized
Announced-to-energized gap: 1.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 1.10 GW | 2025-01-16 | reported | press release |
Key facts
Lifecycle
Announced
Energized
STACK Infrastructure
Developer
Location
Grid
Land
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Campus scale (announced)
- STACK Infrastructure announced the Stafford Technology Campus (STC) as its largest flagship development to date: 1+ GW in Stafford County, Virginia, spanning 500 acres with four sub-campuses and 19 data centers (STACK, Jan 16 2025)
- Power / utility (announced)
- Company says the campus will draw committed power from six 300 MW Dominion Energy substations (STACK, Jan 16 2025)
- Economic claims (announced)
- STACK cites water/sewer upgrades that eliminate $58M from the county Capital Improvement Program, more than $80M annual tax revenue at full buildout, hundreds of full-time jobs, and over 1,000 construction jobs at peak (STACK, Jan 16 2025)
- Cooling / siting approach (announced)
- Project incorporates a reclaimed (purple pipe) water system for permanent industrial cooling to avoid potable-water impact. Site described as adjoining a landfill and light industrial development, distanced from residential areas (STACK, Jan 16 2025)
On the data center map
Every tracked data center is on this map, centered on STACK Stafford Technology Campus. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
In clusterVirginia(338)
The deal
- developer
- STACK Infrastructure
- utility
- Dominion Energy · six 300 MW substations committed
Power
- Power source
- grid
- Grid operator
- PJM
- Interconnection
- Water
- Reclaimed water system for industrial cooling; project funds water/sewer upgrades eliminating $58M from Stafford County's Capital Improvement Program
The PJM grid demand right now: 88.9 GW (EIA-930, 2026-10-02 05:00). STACK Stafford Technology Campus's announced 1.10 GW would be 1.2% of the grid's current load.
County water status: No drought in Stafford County, week of 2026-09-29 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
STACK Stafford Technology Campus sits on greenfield in Virginia, Stafford. It connects to the PJM grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
Timeline
- Aug 2026party addedutility: Dominion Energy
- Oct 2026Current: Permitted
Sources
- STACK Infrastructure Announces Landmark 1+GW Stafford Technology Campus in Northern Virginia
- Data Centers (official county tracker)
01bdc2de-ec3c-4d49-ab28-d2032658ed62 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is STACK Stafford Technology Campus?
How much power will STACK Stafford Technology Campus use?
Who is building STACK Stafford Technology Campus?
Is STACK Stafford Technology Campus operating yet?
How verified is the data on STACK Stafford Technology Campus?
Deploy Watch
Track STACK Stafford Technology Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). STACK Stafford Technology Campus: AI data center campus record. Retrieved October 2, 2026, from https://registry.deploy.report/datacenters/stack-stafford-technology-campus-virginia
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/stack-stafford-technology-campus-virginia.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/stack-stafford-technology-campus-virginia
- Data documentation: /data
- Query this programmatically: Deploy MCP