Data center campus

STACK Stafford Technology Campus

STACK Stafford Technology Campus is an announced AI data center campus. 1.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Permitted · greenfield · PJM · Stafford, Virginia, United States


Capacity: announced vs energized

Announced
1.10 GW
reported
Contracted
not recorded
Under construction
not recorded
Energized
not recorded

Announced-to-energized gap: 1.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

STACK Stafford Technology Campus capacity claims
Source
Announced1.10 GW2025-01-16reportedpress release

The deal

developer
STACK Infrastructure
utility
Dominion Energy · six 300 MW substations committed

Power

Power source
grid
Grid operator
PJM
Interconnection

Sources

01bdc2de-ec3c-4d49-ab28-d2032658ed62 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.