Crossroads Technology Campus vs PowerHouse 95 (Spotsylvania) Campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Crossroads Technology Campus | PowerHouse 95 (Spotsylvania) Campus | |
|---|---|---|
| Announced capacity | 0.89 GW | 0.80 GW |
| Energized capacity | not recorded | not recorded |
| Announced-to-energized gap | 0.89 GW | 0.80 GW |
| Lifecycle | permitted | under construction |
| Developer | Kettler | PowerHouse Data Centers |
| Location | Virginia, United States | Spotsylvania County, Virginia, United States |
| Grid | not recorded | PJM |
| Acreage | 555 acres | 145 acres |
On the map
Common questions
Which is bigger, Crossroads Technology Campus or PowerHouse 95 (Spotsylvania) Campus?
By announced capacity, Crossroads Technology Campus is larger: 0.89 GW versus 0.80 GW. Announced figures are claims, not built capacity.
Which is further along, Crossroads Technology Campus or PowerHouse 95 (Spotsylvania) Campus?
Crossroads Technology Campus is permitted; PowerHouse 95 (Spotsylvania) Campus is under construction. Energized capacity: not recorded versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Crossroads Technology Campus and PowerHouse 95 (Spotsylvania) Campus?
Crossroads Technology Campus is in Virginia, United States; PowerHouse 95 (Spotsylvania) Campus is in Spotsylvania County, Virginia, United States. Each record on DEPLOY is sourced and dated.