Data center campus

Voltage Park Dallas

Voltage Park Dallas is a tracked AI data center campus in Dallas-Fort Worth, Texas, USA. Texas H100 pod, part of the 6-DC / 4-state footprint

Energized · Voltage Park · Dallas-Fort Worth, Texas, USA


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Voltage Park Dallas capacity claims
Source

Key facts

On the data center map

Every tracked data center is on this map, centered on Voltage Park Dallas. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Voltage Park

Power

Power source
grid
Interconnection

County water status: Severe drought (D2) in Dallas County, week of 2026-08-25 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Voltage Park Dallas is in Dallas-Fort Worth, Texas, USA. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

9536b7d8-4621-48da-bec1-873a84da0037 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Voltage Park Dallas?
Voltage Park Dallas is an AI data center campus tracked on the DEPLOY registry, located in Dallas-Fort Worth, Texas, USA. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Voltage Park Dallas?
Voltage Park is recorded as a party to Voltage Park Dallas on the DEPLOY registry. The full party list, with each role, is on the record.
Is Voltage Park Dallas operating yet?
As of the most recent verification on the DEPLOY registry, Voltage Park Dallas is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Voltage Park Dallas?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Voltage Park Dallas on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Voltage Park Dallas: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/voltage-park-dallas

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces