Meta Eagle Mountain Data Center Campus

Meta Eagle Mountain Data Center Campus is an announced AI data center campus. 1.80 GW of capacity has been announced; 0.20 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · greenfield · WECC · Eagle Mountain, Utah, United States


Capacity: announced vs energized

Announced
1.80 GW
claimed
Contracted
not recorded
Under construction
not recorded
Energized
0.20 GW
reported

Announced-to-energized gap: 1.60 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Meta Eagle Mountain Data Center Campus capacity claims
Source
Announced1.80 GW2025-11-21claimedjournalist report
Energized0.20 GW2025-02-01reportedpress release

The deal

operator
Meta Platforms
utility
Rocky Mountain Power (PacifiCorp) · Schedule 34 renewable tariff

Power

Power source
grid
Grid operator
WECC
Interconnection

Faraday Solar, 0.69 GW solar, Energized. 685.3 MWdc; 20-year PPA via Rocky Mountain Power Schedule 34.

Sources

a76e96bd-5e07-444b-ba92-4995dcb78add · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.