Meta Eagle Mountain Data Center Campus
Meta Eagle Mountain Data Center Campus is an announced AI data center campus. 1.80 GW of capacity has been announced; 0.20 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · greenfield · WECC · Eagle Mountain, Utah, United States
Capacity: announced vs energized
Announced-to-energized gap: 1.60 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 1.80 GW | 2025-11-21 | claimed | journalist report |
| Energized | 0.20 GW | 2025-02-01 | reported | press release |
The deal
- operator
- Meta Platforms
- utility
- Rocky Mountain Power (PacifiCorp) · Schedule 34 renewable tariff
Power
- Power source
- grid
- Grid operator
- WECC
- Interconnection
Faraday Solar, 0.69 GW solar, Energized. 685.3 MWdc; 20-year PPA via Rocky Mountain Power Schedule 34.
Sources
- Facebook parent Meta announces mega expansion to Eagle Mountain data center project
- Utah's largest solar plant becomes operational, set to power Eagle Mountain data center
a76e96bd-5e07-444b-ba92-4995dcb78add · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.