Data center campus

Meta / BlackRock El Paso AI Data Center Campus

Meta / BlackRock El Paso AI Data Center Campus is an announced AI data center campus. 1 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · Private land · El Paso, Texas, United States


Capacity: announced vs energized

Announced
1 GW
verified
Contracted
1 GW
reported
Under construction
not recorded
Energized
0 GW
verified

Announced-to-energized gap: 1 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Meta / BlackRock El Paso AI Data Center Campus capacity claims
Source
Announced1 GW2026-07-28verifiedpress release
Contracted1 GW2026-07-28reportedutility filing
Energized0 GW2026-07-28verifiedpress release

The deal

developer
Meta Platforms · Built the campus; retains 20% of the venture and leases capacity back (4-year initial term, up to ~20 years)
financier
BlackRock (managed funds) · Owns 80% of the venture; ~$4.9B cash contribution plus $12.5B debt financing
utility
El Paso Electric · Grid supplier, up to 1.0 GW (WECC region)

Power

Power source
mixed
Interconnection

El Paso Electric grid supply, 1 GW grid interconnect, Announced. Up to 1.0 GW committed, right to request up to 1.4 GW; El Paso Electric is a WECC utility

Proposed on-site natural gas plant, 0.37 GW gas, Announced. Meta-proposed dedicated ~366 MW gas plant

Financial structure

Total venture development cost
$14B. Approximately $14B for buildings and infrastructure press release
BlackRock cash contribution at close
$4.9B. 80% JV interest; funded partly by $12.5B debt financing press release
Meta construction and development investment
$10B. Over $10B press release

Sources

cca163a4-35f9-4342-b4fa-2e44ddfbd03a · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.