Meta Talavera de la Reina Data Center Campus (Torrehierro)
Meta Talavera de la Reina Data Center Campus is an AI data center campus developed by Meta Platforms in Toledo (Castilla-La Mancha), Talavera de la Reina. 0.25 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · Meta Platforms · other · Talavera de la Reina, Toledo (Castilla-La Mancha), Spain
Capacity: announced vs energized
Announced-to-energized gap: 0.25 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2030. 52 months away. Claimed by Meta / local planning reports (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.25 GW | 2024-06-01 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Announced-to-energized gap
On the data center map
No mappable coordinate is recorded for Meta Talavera de la Reina Data Center Campus (Torrehierro) yet. Location: Talavera de la Reina.
The deal
- developer
- Meta Platforms · Developer and operator; Meta's fourth European data center
- utility
- Red Electrica / Redeia · Developing the 220 kV substation at Calera y Chozas
Power
- Power source
- grid
- Grid operator
- other
- Interconnection
220 kV substation at Calera y Chozas (Red Electrica/Redeia), grid, Under construction. Grid interconnection for the campus
Why here
Meta Talavera de la Reina Data Center Campus is in Toledo (Castilla-La Mancha), Talavera de la Reina. It connects to the other grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Meta investment 2024-2030 (~EUR 1.03bn)
- $1.1B journalist report
Investment, workforce and specs
Timeline
- Aug 2026party addedutility: Red Electrica / Redeia
- Aug 2026Current: Under construction
Sources
- Opening water-guzzling datacenter in empty and dry Spain
- Meta Data Center in Talavera de la Reina will be a 1,000 million dollars investment
- Meta Drives Europe's Digital Future from Talavera: What Its Torrehierro Data Center Will Look Like
6e1e64cb-aa2a-424b-8dfe-59d1535ae1e9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Meta Talavera de la Reina Data Center Campus (Torrehierro)?
How much power will Meta Talavera de la Reina Data Center Campus (Torrehierro) use?
Who is building Meta Talavera de la Reina Data Center Campus (Torrehierro)?
Is Meta Talavera de la Reina Data Center Campus (Torrehierro) operating yet?
How verified is the data on Meta Talavera de la Reina Data Center Campus (Torrehierro)?
Deploy Watch
Track Meta Talavera de la Reina Data Center Campus (Torrehierro) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Meta Talavera de la Reina Data Center Campus (Torrehierro): AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/meta-talavera-de-la-reina
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/meta-talavera-de-la-reina.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/meta-talavera-de-la-reina
- Data documentation: /data
- Query this programmatically: Deploy MCP