Data center comparison
Meta Eagle Mountain Data Center Campus vs Meta Talavera de la Reina Data Center Campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Meta Eagle Mountain Data Center Campus | Meta Talavera de la Reina Data Center Campus | |
|---|---|---|
| Announced capacity | 1.80 GW | 0.25 GW |
| Energized capacity | 0.20 GW | not recorded |
| Announced-to-energized gap | 1.60 GW | 0.25 GW |
| Lifecycle | partially energized | under construction |
| Developer | Meta Platforms | Meta Platforms |
| Location | Eagle Mountain, Utah, United States | Talavera de la Reina, Toledo (Castilla-La Mancha), Spain |
| Grid | WECC | other |
| Acreage | not recorded | not recorded |
On the map
Common questions
Which is bigger, Meta Eagle Mountain Data Center Campus or Meta Talavera de la Reina Data Center Campus?
By announced capacity, Meta Eagle Mountain Data Center Campus is larger: 1.80 GW versus 0.25 GW. Announced figures are claims, not built capacity.
Which is further along, Meta Eagle Mountain Data Center Campus or Meta Talavera de la Reina Data Center Campus?
Meta Eagle Mountain Data Center Campus is partially energized; Meta Talavera de la Reina Data Center Campus is under construction. Energized capacity: 0.20 GW versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Meta Eagle Mountain Data Center Campus and Meta Talavera de la Reina Data Center Campus?
Meta Eagle Mountain Data Center Campus is in Eagle Mountain, Utah, United States; Meta Talavera de la Reina Data Center Campus is in Talavera de la Reina, Toledo (Castilla-La Mancha), Spain. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.