Meta Lebanon Data Center is an announced AI data center campus. 1 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · greenfield · MISO · Lebanon, Indiana, United States
Capacity: announced vs energized
Announced
1 GW
claimed
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Announced-to-energized gap: 1 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 1 GW | 2026-02-11 | claimed | press release |
The deal
- operator
- Meta Platforms
- utility
- Boone County REMC · serving co-op; Meta pays full energy cost per announcement
Power
- Power source
- grid
- Grid operator
- MISO
- Interconnection
Sources
- Meta Makes Lebanon Data Center Announcement Official
- Details on long-expected Meta data center campus unveiled
aca9e9b9-db6a-469a-926b-79c18512452f · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.