Data center campus
Meta Los Lunas Data Center Campus
Meta Los Lunas Data Center Campus is a tracked AI data center campus in New Mexico, Valencia County. Meta's roughly 750-acre Los Lunas campus houses eight completed data center buildings (about 3.8 million sq ft). A 2025 expansion of two additional buildings, an approximately $800 million investment, is described as the
Partially energized · Meta · Private land · WECC · Los Lunas, Valencia County, New Mexico, United States
Capacity: announced vs energized
Promised online: 2027. Energized capacity is now on record. Claimed by Meta (reported) (source).
| Source | ||||
|---|---|---|---|---|
| Energized | 0.04 GW | 2025-06-01 | claimed | tracker |
Key facts
Lifecycle
Energized
Developer
Location
Grid
Land
Facilities tracked
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Investment / groundbreaking / jobs (primary Meta)
- Meta's Los Lunas data center fact sheet states data center investment in New Mexico of $2.5B+, groundbreaking in 2016, 1,100 skilled trade workers on site at peak construction, 400+ operational jobs supported, 250+ grants and sponsorships provided locally since 2019, and $6.2M+ direct funding to Valencia County-area schools and nonprofits (Meta Los Lunas fact sheet)
- 100% clean energy / NM renewables + storage (primary Meta)
- The same Meta fact sheet says Meta worked with Public Service Company of New Mexico (PNM) on energy planning and cost allocation so consumers are not negatively impacted, matches all electricity use with 100% clean and renewable energy, and supports 21 projects across 9 New Mexico counties adding 1,465 MW of new clean and renewable energy and 488 MW of battery storage. Operational data center buildings are described as achieving LEED Gold (Meta Los Lunas fact sheet)
- Water stewardship / village full-cost water (primary Meta)
- Meta states it worked with the Village of Los Lunas to pay the full cost of water and wastewater service for the data center, prioritizes on-site efficiency (more water-efficient cooling than industry standard, reuse before discharge, native landscaping, water-saving fixtures), and aims to restore more water to local New Mexico watersheds than the site consumes via partner projects, consistent with Meta's global water-positive 2030 goal (Meta Los Lunas fact sheet)
On the data center map
Every tracked data center is on this map, centered on Meta Los Lunas Data Center Campus. Pan or zoom out to see how close rivals are building.
- Announced capex
- $800M
- Jobs
- 300 permanent reported
- Cooling
- Eight completed buildings totaling ~3.8 million sq ft on ~750-acre parcel
- Cost per job
- $3M per permanent job
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterValencia County(4)·New Mexico(28)
The deal
Power
- Power source
- mixed
- Grid operator
- WECC
- Interconnection
- Water
- New AI-dedicated buildings designed to use substantially less water than earlier buildings
Meta New Mexico renewable procurement, 0.89 GW solar, Energized. More than 885 MW of renewable capacity procured in New Mexico to offset campus use
Contracted solar + wind portfolio (~885MW) for Meta Los Lunas, 0.89 GW solar, Financed. ~885MW contracted solar/wind capacity powering the campus
PNM hybrid battery energy storage (BESS) offtake, 0.10 GW storage, Announced. ~100MW battery storage; PNM sought PRC approval of hybrid BESS offtake to serve Meta
County water status: Severe drought (D2) in Valencia County, week of 2026-09-29 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Meta Los Lunas Data Center Campus sits on private land in New Mexico, Valencia County. It connects to the WECC grid, draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Meta AI-dedicated expansion (two buildings)
- $800M. About three-year construction timeline journalist report
- 2025 AI-dedicated expansion (2 buildings)
- $800M journalist report
- Cumulative investment in eight campus buildings
- $2B. ~$2B invested to date across eight buildings tracker
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
Facilities at this campus
- Meta Los Lunas AI Expansionhyperscale
- Meta Los Lunas Campushyperscale
- Meta Los Lunas Data Centerhyperscale
Timeline
- Aug 2026party addedgrid_operator: WECC
- Oct 2026Current: Partially energized
Sources
- DCD: Meta plans Los Lunas expansion
- News-Bulletin: Los Lunas Meta AI expansion
- Meta's Los Lunas Data Center (fact sheet)
- Hello Again, Los Lunas!
60054c7b-1a7e-492e-9871-dfbafcf75161 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Meta Los Lunas Data Center Campus?
Who is building Meta Los Lunas Data Center Campus?
Is Meta Los Lunas Data Center Campus operating yet?
How verified is the data on Meta Los Lunas Data Center Campus?
Deploy Watch
Track Meta Los Lunas Data Center Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Meta Los Lunas Data Center Campus: AI data center campus record. Retrieved October 4, 2026, from https://registry.deploy.report/datacenters/meta-los-lunas-new-mexico
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/meta-los-lunas-new-mexico.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/meta-los-lunas-new-mexico
- Data documentation: /data
- Query this programmatically: Deploy MCP