Data center campus
Project Blue (Beale Infrastructure Pima County data center)
Project Blue is an announced AI data center campus. 0.60 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · greenfield · WECC · Tucson, Arizona, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.60 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.60 GW | 2025-08-27 | reported | journalist report |
| Contracted | 0.29 GW | 2025-12-05 | verified | utility filing |
The deal
- developer
- Beale Infrastructure · San Francisco-based; land purchaser entity Humphrey's Peak Properties.
- utility
- Tucson Electric Power (TEP) · ACC-approved delivery agreement 2025-12-05.
- offtaker
- Undisclosed · AWS reported original operator per 2023 county memo; never publicly confirmed and reportedly withdrew. Meta also rumored then reportedly out.
Power
- Power source
- grid
- Grid operator
- WECC
- Interconnection
Tucson Electric Power grid interconnection, 0.29 GW grid interconnect, Announced. Grid-served via TEP (WECC); no on-site generation reported. ACC-approved.
Sources
- TEP seeks OK to serve Project Blue at site rejected by Tucson council
- Rejected by Tucson and abandoned by Amazon, Project Blue data center moves forward
- Project Blue developers close on purchase of Pima County land
- New lawsuit threatens Project Blue in Pima County
8232a60d-0da2-4f84-866f-abd7e82bfb0f · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.