Data center campus

Project Blue (Beale Infrastructure Pima County data center)

Project Blue is an announced AI data center campus. 0.60 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · greenfield · WECC · Tucson, Arizona, United States


Capacity: announced vs energized

Announced
0.60 GW
reported
Contracted
0.29 GW
verified
Under construction
not recorded
Energized
not recorded

Announced-to-energized gap: 0.60 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Project Blue (Beale Infrastructure Pima County data center) capacity claims
Source
Announced0.60 GW2025-08-27reportedjournalist report
Contracted0.29 GW2025-12-05verifiedutility filing

The deal

developer
Beale Infrastructure · San Francisco-based; land purchaser entity Humphrey's Peak Properties.
utility
Tucson Electric Power (TEP) · ACC-approved delivery agreement 2025-12-05.
offtaker
Undisclosed · AWS reported original operator per 2023 county memo; never publicly confirmed and reportedly withdrew. Meta also rumored then reportedly out.

Power

Power source
grid
Grid operator
WECC
Interconnection

Tucson Electric Power grid interconnection, 0.29 GW grid interconnect, Announced. Grid-served via TEP (WECC); no on-site generation reported. ACC-approved.