Deploy Watch
Track Beale Infrastructure on Deploy.
We notify you when a verified state change lands on the record, not when the company issues a claim.
Key facts
Headquarters
Status
Type
Partnerships
Every company Beale Infrastructure has built with, alongside the ones only announced in a press release.
Relationships
Current leadership (1)
- Julian Kudritzki COOsecondary-verified
Safety record
No incidents on record for Beale Infrastructure.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
Full safety record: incidents, sourcing, and exposure data →
Beale Infrastructure on the data-center map
Every verified data center Beale Infrastructure operates that has a mapped coordinate (11 total). Filled circles are Tier-2 facilities and Tier-1 campuses under this operator; click any pin to open its record.
Beale Infrastructure data centers (11)
- Beale Gardner Data Center CampusGardner · under construction
- De Soto Data Center Campus (Project Pilot)De Soto · under construction
- Luckett Road Project (Marana)Marana · planned
- Project BlueTucson · under construction
- Project Clydesdale Data CampusOwasso · under construction
- Project Clydesdale Data CenterOwasso · under construction
- Project Mustang Data CenterClaremore · planned
- Beale Marana CampusMarana · 1500 MW
- Beale De Soto Data Center CampusDe Soto · 600 MW
- Beale Tulsa County CampusTulsa · 500 MW
- Project MustangClaremore · 450 MW
AI data centers Beale Infrastructure operates or is a party to, from the DEPLOY data center registry.
Recent coverage
Beale Infrastructure in third-party press
A Kansas data center doubled to 2.9 million square feet: why residents call it a breach of trust - OkDiario
Hanns Lee Joins Beale Infrastructure to Lead Development, Deepening Focus on Sustainable, Community-Driven Growth - Yahoo Finance
Arizona is asking for more Colorado River water to feed data centers while facing a 77% cut in its share - Startup Fortune
Financial state
- Reporting basis
- aggregator_estimate
- Lifecycle stage
- early
- Counterparty risk class
- unknown
Each numeric field carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Partnerships
3 total · 3 operating
Every company Beale Infrastructure has built with, alongside the ones only announced in a press release.
Most recent
Recent activity
Every change to this record is dated, sourced, and independently verified where marked.
- Record createdAug 19, 2026
Added to the verified registry
Common questions
What is Beale Infrastructure?
What does Beale Infrastructure make?
Is Beale Infrastructure publicly traded?
How can I invest in Beale Infrastructure?
Where is Beale Infrastructure headquartered?
Who owns Beale Infrastructure?
Is Beale Infrastructure a top robotics company?
Is Beale Infrastructure safe?
Methodology: Claimed (not independently verified) · no sources on file · last reviewed 2026-08-21
Verification posture
Claimed (not independently verified)
Low confidence
Review state
Stable
Last reviewed 2026-08-21
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Beale Infrastructure.In the press
Recent coverage mentioning Beale Infrastructure from third-party publications. Automatically surfaced; not part of the verified registry record.
A Kansas data center doubled to 2.9 million square feet: why residents call it a breach of trust - OkDiario
<a…
Hanns Lee Joins Beale Infrastructure to Lead Development, Deepening Focus on Sustainable, Community-Driven Growth - Yahoo Finance
<a…
Arizona is asking for more Colorado River water to feed data centers while facing a 77% cut in its share - Startup Fortune
<a…
On eve of hearing, more details emerge on Coweta data center proposal - Broken Arrow Sentinel
<a…
Transition-AI 2026 - Latitude Media
<a…
Machine-readable surfaces
- Markdown mirror: /companies/beale-infrastructure.md
- RSS feed: /companies/beale-infrastructure/feed.xml
- JSON-LD: embedded in this page’s head
- REST API: /v1/companies/4dcf659d-8c21-4332-8558-962d03c4c764
- Revision history: /companies/beale-infrastructure/history
- Data documentation: /data
- Query this programmatically: Deploy MCP
Heat Index
Serious56/100
A composite of competitive footprint, funding, press velocity, active partnerships, and supply-chain edges. Different from the Intelligence score below (which is per-form-factor productization). Non-robotics companies cap at 25.
Reality vs attention
Not enough verified signal yet to place Beale Infrastructure against peers. Reality and attention percentiles publish once the underlying record clears its data floor.
6-month trend
Analysis
Limited public funding data for capital position assessment.
Dimension breakdown
Verified signal
Attention (reach, not merit)
DEPLOY Intelligence scores are computed from verified registry data: confirmed deployments, disclosed funding rounds, regulatory filings, active job listings, video viewership, and press coverage. Confidence ratings reflect data availability. Scores update nightly.
DEPLOY Indices — verified vs claimed
Last computed: Oct 4, 2026