EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)

EdgeCore Mesa is an announced AI data center campus. 0.45 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Permitted · Private land · WECC · Mesa, Arizona, United States


Capacity: announced vs energized

Announced
0.45 GW
reported
Contracted
not recorded
Under construction
not recorded
Energized
not recorded

Announced-to-energized gap: 0.45 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) capacity claims
Source
Announced0.45 GW2025-05-21reportedcounty docket

The deal

developer
EdgeCore Digital Infrastructure
utility
Salt River Project (SRP) · Mesa/Eastmark corridor; specific service agreement not confirmed.

Power

Power source
grid
Grid operator
WECC
Interconnection