Data center campus
EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)
EdgeCore Mesa is an announced AI data center campus. 0.45 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Permitted · Private land · WECC · Mesa, Arizona, United States
Capacity: announced vs energized
Announced
0.45 GW
reported
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Announced-to-energized gap: 0.45 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.45 GW | 2025-05-21 | reported | county docket |
The deal
- developer
- EdgeCore Digital Infrastructure
- utility
- Salt River Project (SRP) · Mesa/Eastmark corridor; specific service agreement not confirmed.
Power
- Power source
- grid
- Grid operator
- WECC
- Interconnection
Sources
- EdgeCore's massive data center campus in Mesa clears checkpoint
- EdgeCore expands Mesa data center campus in Arizona