Data center campus
Compass Phoenix Goodyear Campus
Compass Phoenix Goodyear Campus is a tracked AI data center campus in Arizona, Goodyear.
Announced · Compass Datacenters · Goodyear, Arizona, United States
Capacity: announced vs energized
| Source |
|---|
Construction evidence
Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.
Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones synthesized from the campus's own capacity ledger, financial claims, and lifecycle events; each chip links to its source. How we source and verify it: satellite construction evidence.
Per-building manifest tied to the site polygons and imagery. When we know a building's outline we render it; when we know only its year and capacity we still surface those as first-class rows so the campus total is auditable, not a headline claim. Sorted largest-first; top 6 shown by default of 25.
Manifest totals: 10,204,635 sqft. Rolled from the per-building rows above.
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- IT capacity
- 212 MW (212 MW planned per operator markets page)
On the data center map
Every tracked data center is on this map, centered on Compass Phoenix Goodyear Campus. Pan or zoom out to see how close rivals are building.
In clusterArizona(149)
The deal
- developer
- Compass Datacenters
Power
- Power source
- grid
- Interconnection
County water status: Severe drought (D2) in Maricopa County, week of 2026-08-18 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Compass Phoenix Goodyear Campus is in Arizona, Goodyear. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Facilities at this campus
- Phoenix (Goodyear)hyperscale
- Compass Datacenters Goodyear Campus350 MW
- Compass Phoenix (Goodyear)212 MW
- Compass Phoenix Campus (Goodyear)212 MW
Sources
09c33d5b-2339-42b3-a4b5-4a249daca082 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Compass Phoenix Goodyear Campus?
Who is building Compass Phoenix Goodyear Campus?
Is Compass Phoenix Goodyear Campus operating yet?
How verified is the data on Compass Phoenix Goodyear Campus?
Deploy Watch
Track Compass Phoenix Goodyear Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Compass Phoenix Goodyear Campus: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/compass-datacenters-compass-phoenix-goodyear-campus
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/compass-datacenters-compass-phoenix-goodyear-campus.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/compass-datacenters-compass-phoenix-goodyear-campus
- Data documentation: /data
- Query this programmatically: Deploy MCP