Data center campus
Google Mesa Data Center (Redhawk)
~$600M air-cooled campus; Phase 1 data hall reported operational since July 2025. Google signed an SRP energy agreement for 430+ MW of new carbon-free (wind/solar/storage) capacity from NextEra to serve Arizona operations. The 430 MW is con
Energized · Private land · WECC · Mesa, Arizona, United States
Capacity: announced vs energized
Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
| Source |
|---|
The deal
- operator
- utility
- Salt River Project (SRP)
- operator
- NextEra Energy Resources · Operator of the contracted generation, not the data center.
Power
- Power source
- solar storage
- Grid operator
- WECC
- Interconnection
SRP/NextEra carbon-free supply, 0.43 GW solar, Announced. 430+ MW of new carbon-free capacity contracted via SRP; blends wind, solar and battery storage.
Sources
- Google signs agreement with SRP to support more than 430 carbon-free megawatts
- In lieu of water cooling, Google locks down renewables for Mesa data center
121efb2d-c261-49da-af33-27e6a989a1b1 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.