Data center campus
Google Mesa Data Center (Redhawk)
Google Mesa Data Center is an AI data center campus developed by Google in Arizona, Mesa. 0.40 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Energized · Google · Private land · WECC · Mesa, Arizona, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.40 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.40 GW | 2025-06-01 | claimed | tracker |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Facilities tracked
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- First Arizona DC / air-cooled design (primary Google)
- Google's sustainability blog (Mar 14 2024) states construction had started on its first Arizona data center in Mesa, designed with air-cooled technology to minimize net environmental impact across water and energy, and projected the Mesa site would be operational in 2025 (Google The Keyword, Mar 14 2024)
- SRP 430+ MW carbon-free supply agreement (primary Google)
- Google announced an energy supply agreement with Salt River Project (SRP) to support more than 430 megawatts of new-to-the-grid carbon-free capacity in Arizona (wind, solar, and battery storage) from three NextEra Energy Resources facilities on SRP's grid: Sonoran Solar Energy Center, Storey Energy Center, and Babbitt Ranch Energy Center. Google projected the agreement would help Arizona operations reach at least 80% hourly carbon-free energy by 2026. The 430+ MW figure is contracted clean-energy supply, not a disclosed campus IT/critical-load rating (Google The Keyword, Mar 14 2024)
- Community programs (primary Google)
- Alongside the SRP deal, Google said it is funding Mesa Shade Tree Program workshops (about 600 new trees per year) and provided $100,000 to Mesa College Promise for free community-college tuition support (Google The Keyword, Mar 14 2024)
On the data center map
Every tracked data center is on this map, centered on Google Mesa Data Center. Pan or zoom out to see how close rivals are building.
- Announced capex
- $600M
- Cooling
- Air-cooled
- Cost per MW
- $2M/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterArizona(149)
The deal
- utility
- Salt River Project (SRP)
- operator
- NextEra Energy Resources · Operator of the contracted generation, not the data center.
- operator
- offtaker
- Salt River Project · SRP procures >430 MW new carbon-free capacity from NextEra facilities to supply the Google Mesa campus (agreement announced March 18, 2024)
Power
- Power source
- solar storage
- Grid operator
- WECC
- Interconnection
- Water
- Air-cooled to minimize water consumption given regional water scarcity (Google)
SRP/NextEra carbon-free supply, 0.43 GW solar, Announced. 430+ MW of new carbon-free capacity contracted via SRP; blends wind, solar and battery storage.
Sonoran Solar Energy Center, 0.26 GW solar, Energized. 260 MW solar + 1 GWh (4-hr) battery storage; NextEra facility south of Buckeye, AZ; commissioned and operational. Part of SRP agreement supplying >430 MW carbon-free to Google Mesa
Storey Energy Center, 0.09 GW solar, Energized. 88 MW solar + battery storage; NextEra facility in Coolidge, AZ; commissioned and operational
Babbitt Ranch Energy Center, 0.16 GW wind, Under construction. 161 MW wind, NextEra facility in Coconino County (north of Flagstaff); under development. Part of SRP >430 MW carbon-free agreement
County water status: Extreme drought (D3) in Maricopa County, week of 2026-09-29 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Google Mesa Data Center sits on private land in Arizona, Mesa. It connects to the WECC grid, draws on solar storage power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Redhawk Phase 1 capital outlay
- $600M. Committed spend threshold by July 2025 (Phase 1 completion deadline) journalist report
- Redhawk full campus buildout (est.)
- $1B. Full ~750,000 sq ft buildout valuation journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
Facilities at this campus
- Mesa Data Centerhyperscale
Timeline
- Aug 2026party addedofftaker: Salt River Project
- Oct 2026Current: Energized
Sources
- Google signs agreement with SRP to support more than 430 carbon-free megawatts
- In lieu of water cooling, Google locks down renewables for Mesa data center
- How Google brought carbon-free energy to Arizona
121efb2d-c261-49da-af33-27e6a989a1b1 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Google Mesa Data Center (Redhawk)?
How much power will Google Mesa Data Center (Redhawk) use?
Who is building Google Mesa Data Center (Redhawk)?
Is Google Mesa Data Center (Redhawk) operating yet?
How verified is the data on Google Mesa Data Center (Redhawk)?
Deploy Watch
Track Google Mesa Data Center (Redhawk) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Google Mesa Data Center (Redhawk): AI data center campus record. Retrieved October 2, 2026, from https://registry.deploy.report/datacenters/google-mesa-redhawk
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/google-mesa-redhawk.md