DEPLOYDatabase

Data center campus

Google Mesa Data Center (Redhawk)

~$600M air-cooled campus; Phase 1 data hall reported operational since July 2025. Google signed an SRP energy agreement for 430+ MW of new carbon-free (wind/solar/storage) capacity from NextEra to serve Arizona operations. The 430 MW is con

Energized · Private land · WECC · Mesa, Arizona, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Google Mesa Data Center (Redhawk) capacity claims
Source

The deal

operator
Google
utility
Salt River Project (SRP)
operator
NextEra Energy Resources · Operator of the contracted generation, not the data center.

Power

Power source
solar storage
Grid operator
WECC
Interconnection

SRP/NextEra carbon-free supply, 0.43 GW solar, Announced. 430+ MW of new carbon-free capacity contracted via SRP; blends wind, solar and battery storage.

Sources

121efb2d-c261-49da-af33-27e6a989a1b1 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.