Data center campus
Google Pryor (MidAmerica) Data Center Campus
Google Pryor (MidAmerica) Data Center Campus is a tracked AI data center campus in Oklahoma, Pryor. Google's Pryor campus in the MidAmerica Industrial Park has operated since 2011 and has drawn about $4.4 billion in cumulative investment, ranking as one of Google's largest data centers. In August 2025 Google announced
Partially energized · Leeward Renewable Energy · Private land · SPP · Pryor, Oklahoma, United States
Capacity: announced vs energized
Promised online: 2027. Energized capacity is now on record. Claimed by Google (reported) (source).
| Source | ||||
|---|---|---|---|---|
| Energized | 0.09 GW | 2025-06-01 | claimed | tracker |
Key facts
Lifecycle
Energized
Leeward Renewable Energy
Developer
Location
Grid
Land
On the data center map
Every tracked data center is on this map, centered on Google Pryor (MidAmerica) Data Center Campus. Pan or zoom out to see how close rivals are building.
The deal
- operator
- Google · Owner and operator
- land owner
- MidAmerica Industrial Park · Host industrial park
- utility
- Grand River Dam Authority (GRDA) · Supplies power to Google's Pryor campus, including Leeward solar portfolio
- grid operator
- Southwest Power Pool (SPP)
- developer
- Leeward Renewable Energy · Solar generation developer for Google OK PPA
Power
- Power source
- grid
- Grid operator
- SPP
- Interconnection
Leeward 724MW solar portfolio (via GRDA), 0.72 GW solar, Financed. Solar delivered to Grand River Dam Authority, which supplies Google's Pryor operations; part of >700MW new clean capacity added for OK ops
The SPP grid demand right now: 38.8 GW (EIA-930, 2026-08-20 06:00).
County water status: Moderate drought (D1) in Mayes County, week of 2026-08-11 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Google Pryor (MidAmerica) Data Center Campus sits on private land in Oklahoma, Pryor. It connects to the SPP grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Google Oklahoma cloud/AI investment (2-year)
- $9B. Covers Pryor expansion and a new Stillwater campus; Pryor has ~$4.4B cumulative to date press release
- New OK cloud/AI investment (Pryor + Stillwater), 2 yrs
- $9B. Statewide (Pryor expansion + new Stillwater campus), not Pryor-only journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Permanent jobs
- 400+ employed at MidAmerica campus source
Timeline
- Aug 2026party addeddeveloper: Leeward Renewable Energy
- Aug 2026Current: Partially energized
Sources
- DCD: Google to invest $9bn in Oklahoma cloud and AI
- KOSU: Google $9B Oklahoma investment
- Oklahoma Commerce: Google Pryor expansion
0a3c8d26-336c-4f7a-8ffd-0899b60c0928 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Google Pryor (MidAmerica) Data Center Campus?
Who is building Google Pryor (MidAmerica) Data Center Campus?
Is Google Pryor (MidAmerica) Data Center Campus operating yet?
How verified is the data on Google Pryor (MidAmerica) Data Center Campus?
Deploy Watch
Track Google Pryor (MidAmerica) Data Center Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Google Pryor (MidAmerica) Data Center Campus: AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/google-pryor-midamerica-oklahoma
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/google-pryor-midamerica-oklahoma.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/google-pryor-midamerica-oklahoma
- Data documentation: /data
- Query this programmatically: Deploy MCP