Data center campus
Google Goleta Quantum AI Campus
Google Goleta Quantum AI Campus is a tracked AI data center campus in Goleta, California, USA. Google's Goleta campus is the physical home of Google Quantum AI, sited in 2013 to tap the UCSB superconducting-qubit talent pool led by Hartmut Neven and John Martinis. The site combines research offices, an in-house su
Energized · Google · Private land · CAISO · Goleta, California, USA
Capacity: announced vs energized
| Source |
|---|
Key facts
Lifecycle
Energized
Developer
Location
Grid
Land
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Type
- Quantum AI R&D campus (not hyperscale data center)
- Total footprint
- ~300,000 sqft (83,356 sqft purchased Aug 2026 for $32.5M)
- Quantum AI lab
- 301 Mentor Drive — quantum hardware development + fabrication facility
- UCSB partnership
- Quantum computing research partnership with UC Santa Barbara
- Location
- Santa Barbara Research Park, Goleta, CA
- Established
- 2013, chosen for proximity to UCSB's superconducting-qubit talent pool
- Primary chip
- 105-qubit Willow superconducting processor, announced Dec 9, 2024
- Predecessor chip
- 53-qubit Sycamore (2019 quantum-supremacy demonstration)
- Willow benchmark
- Random-circuit sampling in ~5 minutes vs 10^25 years on a classical supercomputer
- Error correction
- First processor to demonstrate below-threshold surface-code error correction (errors decrease as qubit count scales)
- Cooling
- Dilution refrigerators operating at ~10-20 millikelvin
- Fabrication
- In-house superconducting-circuit fab with Josephson-junction patterning
- Aug 2026 acquisition
- 83,356 sqft at 147/153 Castilian Drive purchased for $32.5M from a Bloomsbury/ABC-CLIO seller
- Other sites
- Leased space at 6868 Cortona Drive (~15,000 sqft) and lab at 301 Mentor Drive
- Access program
- Willow Early Access Program for select research partners; not publicly available
- Campus setting
- Entrance to Santa Barbara Research Park, near Los Carneros Rd and Hollister Ave
On the data center map
Every tracked data center is on this map, centered on Google Goleta Quantum AI Campus. Pan or zoom out to see how close rivals are building.
The deal
- operator
- Google · Owner-operator; purchased campus Aug 2026 for $32.5M
Power
- Power source
- grid
- Grid operator
- CAISO
- Interconnection
- Water
- Not a water-cooled hyperscale facility. Quantum processors operate inside dilution refrigerators that use a helium-3/helium-4 mixture to reach millikelvin temperatures; conventional HVAC serves the office and cleanroom envelope.
The California (CAISO) grid demand right now: 42.5 GW (EIA-930, 2026-08-26 00:00).
County water status: No drought in Santa Barbara County, week of 2026-08-18 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Google Goleta Quantum AI Campus sits on private land in Goleta, California, USA. It connects to the CAISO grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- 83,356 sqft campus purchase (147/153 Castilian Drive)
- $33M news
Sources
- Google Buys 83,000-Square-Foot Campus in Goleta for $32.5M · Santa Barbara Independent
- Google Quantum AI Campus · Google Quantum AI
- Willow processor · Wikipedia
- Willow Spec Sheet · Google Quantum AI
- Behind the scenes at the Google Quantum AI lab · Google Blog
- Google's 105-qubit Willow quantum processor opens for early access · SDxCentral
- Google Quantum AI: New Quantum Chip Outperforms Classical Computers and Breaks Error Correction Threshold · The Quantum Insider
- Google's breakthrough Willow quantum chip developed in Goleta · Pacific Coast Business Times / Hayes Commercial
- Exclusive: Google Snaps Up SoCal Asset · Commercial Property Executive
- Google Quantum AI · Wikipedia
81809c99-0329-4153-842d-3d1bda73cedf · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Google Goleta Quantum AI Campus?
Who is building Google Goleta Quantum AI Campus?
Is Google Goleta Quantum AI Campus operating yet?
How verified is the data on Google Goleta Quantum AI Campus?
Deploy Watch
Track Google Goleta Quantum AI Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Google Goleta Quantum AI Campus: AI data center campus record. Retrieved August 26, 2026, from https://registry.deploy.report/datacenters/google-goleta-quantum-ai-campus
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/google-goleta-quantum-ai-campus.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/google-goleta-quantum-ai-campus
- Data documentation: /data
- Query this programmatically: Deploy MCP