Grid operator
AI data centers on the CAISO grid
Every tracked AI data center campus interconnecting to the CAISO grid, with combined announced-vs-energized capacity and the grid's live demand. Each figure is individually dated and sourced.
On this grid
Campuses
4
Announced (combined)
0 GW
Energized (combined)
0 GW
Grid demand now
42.6 GW
The California (CAISO) grid is pulling 42.6 GW right now (EIA-930, 2026-08-25 23:00). Announced numbers are claims, not built capacity; see the methodology.
Campuses on this grid
| AWS Center for Quantum Computing Pasadena | Pasadena, California, USA | energized | — | — |
| Rigetti Computing Berkeley Quantum Lab | Berkeley, California, USA (UC Berkeley) | energized | — | — |
| Google Quantum AI Campus Santa Barbara | Goleta, California, USA | energized | — | — |
| Google Goleta Quantum AI Campus | Goleta, California, USA | energized | — | — |
See every campus on the national data center map, browse the full campus index, or read the verified-vs-claimed methodology.