DEPLOYDatabase

Data center campus

Vermaland La Osa Data Center Park (Pinal County)

Vermaland La Osa Data Center Park is an announced AI data center campus. 3 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Rumored · greenfield · WECC · Eloy, Arizona, United States


Capacity: announced vs energized

Announced
3 GW
claimed
Contracted
not recorded
Under construction
not recorded
Energized
not recorded

Announced-to-energized gap: 3 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Vermaland La Osa Data Center Park (Pinal County) capacity claims
Source
Announced3 GW2025-09-01claimedcounty docket

The deal

developer
Vermaland, LLC · CEO Kuldip Verma; EPS Group Inc. civil engineer/planner.

Power

Power source
behind the meter gas
Grid operator
WECC
Interconnection

On-site gas-fired generation (~480 acres), gas, Announced. Behind-the-meter gas plant proposed as initial power; specific MW not stated.

Sources

7181d3aa-298b-4b24-8284-dac3c43239b6 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.