Data center campus
SpaceX Cochise County Supercompute Campus
SpaceX Cochise County Supercompute Campus is an AI data center campus developed by SpaceX in Arizona. 6 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · SpaceX · Cochise County, Arizona, Arizona, United States
Capacity: announced vs energized
Announced-to-energized gap: 6 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 6 GW | 2026-11-12 | reported | journalist report |
Key facts
On the data center map
Every tracked data center is on this map, centered on SpaceX Cochise County Supercompute Campus. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a county-level coordinate for this campus, not a verified site coordinate, so the marker shows the county rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
In clusterArizona(150)
The deal
- developer
- SpaceX
Power
- Interconnection
County water status: No drought in Cochise County, week of 2026-11-10 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
SpaceX Cochise County Supercompute Campus is in Arizona. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- SpaceX planned investment in the Arizona campus
- $50B journalist report
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026financial recordedinvestment: SpaceX planned investment in the Arizona campus
- Nov 2026Current: Announced
Sources
- SpaceX plans over $74 billion investment in Texas, Arizona AI campuses · CNA (Reuters)
- SpaceX hid behind another name in the Arizona desert, and now it's going big · Teslarati
3cd701d3-7a9a-4210-9a15-372a93ea5fc4 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is SpaceX Cochise County Supercompute Campus?
How much power will SpaceX Cochise County Supercompute Campus use?
Who is building SpaceX Cochise County Supercompute Campus?
Is SpaceX Cochise County Supercompute Campus operating yet?
How verified is the data on SpaceX Cochise County Supercompute Campus?
Deploy Watch
Track SpaceX Cochise County Supercompute Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). SpaceX Cochise County Supercompute Campus: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/spacex-cochise-county-supercompute-campus
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/spacex-cochise-county-supercompute-campus.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/spacex-cochise-county-supercompute-campus
- Data documentation: /data
- Query this programmatically: Deploy MCP