Data center campus

Stratos Project (O'Leary Digital) AI Data Center & Energy Campus

Stratos Project (O'Leary Digital) AI Data Center & Energy Campus is an announced AI data center campus. 3 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Announced · greenfield · WECC · Hansel Valley, Utah, United States


Capacity: announced vs energized

Announced
3 GW
claimed
Contracted
not recorded
Under construction
not recorded
Energized
not recorded

Announced-to-energized gap: 3 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Stratos Project (O'Leary Digital) AI Data Center & Energy Campus capacity claims
Source
Announced3 GW2026-05-04claimedcounty docket

The deal

developer
O'Leary Digital · Kevin O'Leary-backed; partnered with Utah MIDA project area
developer
Military Installation Development Authority (MIDA) · Utah state agency sponsoring the project area
utility
Tallgrass Energy · Prospective natural gas service via Ruby Pipeline connection

Power

Power source
behind the meter gas
Grid operator
WECC
Interconnection

On-site natural gas generation (Ruby Pipeline supply), 9 GW gas, Announced. Self-generated gas plant claimed up to 9 GW; gas via Ruby Pipeline through Tallgrass; no air permit yet.

Sources