Data center campus
Amazon (AWS) Hermiston / Umatilla Data Center Campus
Amazon (AWS) Hermiston / Umatilla Data Center Campus is an announced AI data center campus. 0.50 GW of capacity has been announced; 0.10 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · greenfield · WECC · Hermiston, Oregon, United States
Capacity: announced vs energized
Announced
0.50 GW
claimed
Contracted
not recorded
Under construction
not recorded
Energized
0.10 GW
reported
Announced-to-energized gap: 0.40 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.50 GW | 2024-01-01 | claimed | journalist report |
| Energized | 0.10 GW | 2018-01-01 | reported | journalist report |
The deal
- operator
- Amazon Web Services · Filed GHEZ / LTREZ enterprise-zone abatements
- utility
- Hermiston Energy Services · Municipal utility supplied via BPA; raised rates ~20% over 3 years
- utility
- PacifiCorp (Pacific Power) · Interconnection utility per tracker
Power
- Power source
- grid
- Grid operator
- WECC
- Interconnection
Sources
- Hermiston clears the way for data center industry
- Amazon looking to develop more data centers in Oregon's Hermiston