Amazon (AWS) Hermiston / Umatilla Data Center Campus

Amazon (AWS) Hermiston / Umatilla Data Center Campus is an announced AI data center campus. 0.50 GW of capacity has been announced; 0.10 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · greenfield · WECC · Hermiston, Oregon, United States


Capacity: announced vs energized

Announced
0.50 GW
claimed
Contracted
not recorded
Under construction
not recorded
Energized
0.10 GW
reported

Announced-to-energized gap: 0.40 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Amazon (AWS) Hermiston / Umatilla Data Center Campus capacity claims
Source
Announced0.50 GW2024-01-01claimedjournalist report
Energized0.10 GW2018-01-01reportedjournalist report

The deal

operator
Amazon Web Services · Filed GHEZ / LTREZ enterprise-zone abatements
utility
Hermiston Energy Services · Municipal utility supplied via BPA; raised rates ~20% over 3 years
utility
PacifiCorp (Pacific Power) · Interconnection utility per tracker

Power

Power source
grid
Grid operator
WECC
Interconnection

Sources

14b61c59-fa5c-4cf4-8fe6-6bade90cae32 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.