Cipher Stingray Data Center is a tracked AI data center campus in Texas, Andrews County. Cipher Mining's Stingray site on about 250 acres in Andrews County, West Texas is a roughly 100 MW gross AI data center fully leased to Amazon Web Services under a 15-year agreement. The project is financed with roughly
Under construction · Cipher Mining · Private land · ERCOT · Andrews, Andrews County, Texas, United States
Capacity: announced vs energized
Promised online: Q2 2026. 3 months past the claimed date, with no energized capacity on record. Claimed by Cipher Mining (source).
| Source | ||||
|---|---|---|---|---|
| Contracted | 0.10 GW | 2026-06-01 | reported | company filing |
| Under construction | 0.07 GW | 2026-06-01 | verified | company filing |
Key facts
Lifecycle
Energized
Developer
Location
Grid
Land
Facilities tracked
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Location
- Purpose-built HPC data center in Andrews, Texas (Andrews County), on a site Cipher materials describe as about 250 acres (Cipher Form 8-K closing, Jun 15 2026; capacity/tenant detail in 8-K investor materials via StockTitan)
- Gross / critical IT capacity (announced)
- 100 Gross MW / 70 MW critical IT load under contract (Cipher Stingray investor materials furnished with Form 8-K, via StockTitan)
- Tenant
- 100% pre-leased to Amazon Data Services, Inc. (AWS); Amazon.com, Inc. parent lease guarantee described in transaction materials (Cipher 8-K materials via StockTitan)
- Lease structure (announced)
- Long-term triple-net lease; materials cite a 15-year base term plus three 5-year tenant extension options, 3.0% annual rent escalator, and illustrative contracted lease payments of roughly $2.0–$5.7B depending on extensions (Cipher 8-K materials via StockTitan)
- Target rent commencement
- 10 IT MW network hall targeted April 1, 2027; 60 IT MW data hall targeted May 1, 2027 (Cipher 8-K materials via StockTitan)
- Project financing
- Stingray Compute LLC (wholly-owned indirect Cipher subsidiary) completed an $810.0 million private offering of 6.000% senior secured notes due 2031 on June 15, 2026; proceeds to finish the Stingray Facility, reimburse prior equity (~$61.5M), and fund debt-service reserves (Cipher Form 8-K)
- Construction cost backstop (announced)
- Transaction materials state Amazon agrees to cover construction cost overruns above $10.5MM per IT MW; Cipher provides a completion guarantee (Cipher 8-K materials via StockTitan)
- Developer / issuer entities
- Developer Cipher Stingray LLC; notes issuer Stingray Compute LLC (Cipher Form 8-K)
On the data center map
Every tracked data center is on this map, centered on Cipher Stingray Data Center. Pan or zoom out to see how close rivals are building.
- Announced capex
- $810M
- Tenant
- Amazon Web Services
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterAndrews County(5)·Texas(606)
The deal
- developer
- Cipher Mining · Developer and operator (Cipher Digital)
- tenant
- Amazon Web Services · 15-year lease for turnkey space and power
- financier
- Senior secured noteholders · $810M notes due 2031
Power
- Power source
- grid
- Grid operator
- ERCOT
- Interconnection
The Texas (ERCOT) grid demand right now: 55.8 GW (EIA-930, 2026-10-04 17:00).
County water status: Severe drought (D2) in Andrews County, week of 2026-09-29 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Cipher Stingray Data Center sits on private land in Texas, Andrews County. It connects to the ERCOT grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Stingray project financing (senior secured notes)
- $810M. Backed by 15-year AWS lease with rent escalators company filing
- Senior secured notes financing (construction)
- $810M. $810M senior secured notes due 2031 to fund construction/completion of Stingray company filing
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Capex
- AWS lease underpins up to several billion dollars of contracted lease revenue; includes annual rent escalators and Amazon.com parent guarantees source
Facilities at this campus
- Cipher Chief Facilitycrypto hpc
- Bear Facility40 MW
- Chief Facility40 MW
- Cipher Bear Facility40 MW
Timeline
- Aug 2026party addedfinancier: Senior secured noteholders
- Oct 2026Current: Under construction
Sources
- DCD: Cipher acquires Texas sites for HPC use
- Blockspace: AWS is tenant at Cipher Stingray
- Cipher Mining Form 8-K (FY2025)
- Data Center Map: Cipher Stingray, Andrews TX
- Cipher Digital Inc. Form 8-K — Stingray Compute $810M notes closing
- Cipher Digital Form 8-K Stingray investor materials (via StockTitan)
52a9517b-db07-4eae-af7a-3d06f3595c14 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Cipher Stingray Data Center (AWS)?
Who is building Cipher Stingray Data Center (AWS)?
Is Cipher Stingray Data Center (AWS) operating yet?
How verified is the data on Cipher Stingray Data Center (AWS)?
Deploy Watch
Track Cipher Stingray Data Center (AWS) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Cipher Stingray Data Center (AWS): AI data center campus record. Retrieved October 4, 2026, from https://registry.deploy.report/datacenters/cipher-stingray-andrews-texas
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/cipher-stingray-andrews-texas.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/cipher-stingray-andrews-texas
- Data documentation: /data
- Query this programmatically: Deploy MCP