Data center campus
Amazon (AWS) Boardman Data Center Campus
Amazon (AWS) Boardman Data Center Campus is an AI data center campus developed by Amazon in Oregon, Boardman. 1 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · Amazon · greenfield · WECC · Boardman, Oregon, United States
Capacity: announced vs energized
Announced-to-energized gap: 1 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 1 GW | 2026-03-30 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Existing + expansion count / ~$1B tax package (reported OPB)
- OPB reported (May 2023) that Amazon already had four large data centers in Morrow County and that Port of Morrow approval would let the company build six more under a package described as about $1 billion in tax breaks, after prior backing from the City of Boardman and the Morrow County Commission. County Commission chair David Sykes framed the deal as economic diversification after losses in timber, agriculture CRP acreage, and the Boardman coal plant (OPB, May 19 2023)
- PDX 154 Boardman Airport campus (reported primary county action)
- Tri-Cities Area Journal of Business reports Morrow County Planning Commission approved Amazon's PDX 154 land-use application (March 31 2026 meeting) for a campus east of Boardman Airport with four data-center buildings totaling about 816,000 sq ft (each roughly 190,000 to 218,000 sq ft), plus a 7,260 sq ft industrial water building, stormwater/wastewater ponds, and septic drain field. Conditions include stormwater/wastewater mitigation and lighting that does not harm airport operations (Tri-Cities Area Journal of Business, Apr 14 2026)
- Nitrate settlement context (reported)
- The same Tri-Cities Journal report states Amazon agreed to pay $20.5 million to settle a lawsuit claiming existing Port of Morrow data-center operations contributed to nitrate pollution in local groundwater. Frame as reported litigation outcome, separate from any MW claim (Tri-Cities Area Journal of Business, Apr 14 2026)
On the data center map
Every tracked data center is on this map, centered on Amazon (AWS) Boardman Data Center Campus. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Announced capex
- $30B
- Jobs
- 7,400 permanent reported
- Cost per MW
- $30M/MW
- Cost per job
- $4M per permanent job
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterOregon(85)
The deal
- utility
- PacifiCorp (Pacific Power) · Local retail utility
- utility
- Bonneville Power Administration · Regional balancing authority (WECC)
- operator
- Amazon
Power
- Power source
- mixed
- Grid operator
- WECC
- Interconnection
Bloom Energy fuel cells (Morrow County AWS site), 0.02 GW gas, Announced. Reported ~24 MW behind-the-meter fuel cells supplementing a site with ~40 MW grid available.
County water status: Extreme drought (D3) in Morrow County, week of 2026-09-29 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Amazon (AWS) Boardman Data Center Campus sits on greenfield in Oregon, Boardman. It connects to the WECC grid, draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
Timeline
- Aug 2026party addedutility: Bonneville Power Administration
- Oct 2026Current: Partially energized
Sources
- Morrow County OKs $1 billion deal in tax breaks with Amazon
- Amazon to receive $1 billion in tax breaks in eastern Oregon for new data centers
- Amazon plans another data center southwest of Tri-Cities (PDX 154)
11de3cbb-092d-403c-86fb-37f506ab6361 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Amazon (AWS) Boardman Data Center Campus?
How much power will Amazon (AWS) Boardman Data Center Campus use?
Who is building Amazon (AWS) Boardman Data Center Campus?
Is Amazon (AWS) Boardman Data Center Campus operating yet?
How verified is the data on Amazon (AWS) Boardman Data Center Campus?
Deploy Watch
Track Amazon (AWS) Boardman Data Center Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Amazon (AWS) Boardman Data Center Campus: AI data center campus record. Retrieved October 2, 2026, from https://registry.deploy.report/datacenters/amazon-boardman-morrow-county
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/amazon-boardman-morrow-county.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/amazon-boardman-morrow-county
- Data documentation: /data
- Query this programmatically: Deploy MCP