DEPLOYDatabase

Data center campus

Amazon 'Bridgefield' GWU Ashburn Campus

Amazon 'Bridgefield' GWU Ashburn Campus is a tracked AI data center campus in Virginia, Ashburn. Amazon Data Services plan to redevelop the former George Washington University Virginia Science & Technology Campus in Ashburn, Loudoun County (Route 28 Tax District): 111-122 acres, over 800,000 sq ft across four two-st

Announced · Amazon · Brownfield · PJM · Ashburn, Virginia, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Amazon 'Bridgefield' GWU Ashburn Campus capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Amazon

Developer

PJM

Grid

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

GWU sale / Bridgefield site plan sq ft (reported)
The GW Hatchet reports Amazon Data Services bought GW's ~122-acre Virginia Science and Technology Campus in Ashburn for $427 million and filed a concept site plan (named Bridgefield Tech Center) seeking four data center buildings totaling 805,092 sq ft. An Amazon spokesperson called the filing the first formal step in a lengthy review process and said Amazon would honor GW's right to remain up to five years and begin construction only after the campus is fully vacated (GW Hatchet, Aug 3 2026)
Loudoun acceptance Sep 23 2026 / generators (reported)
Loudoun Now reports that after an initial July 28 submission was not accepted for missing elements (including an archeological report), the revised application was formally accepted by the county on Sep 23, 2026, describing about 805,000 sq ft across four buildings on nine of ten parcels and depicting 84 backup generators. County staff then have 40 days for first-round comments (Loudoun Now, Sep 28 2026)
By-right vs special exception dispute (reported)
Coverage frames a zoning fight: the site sits in the Route 28 Tax District under the 1972 Zoning Ordinance, where Amazon has sought administrative/by-right treatment, while Loudoun officials (including Supervisor Briskman and economic development director Buddy Rizer) argue data centers should require special-exception or other Board review and plan to shift the property toward the 2023 Zoning Ordinance after the tax district is expected to dissolve Dec 5, 2026. Treat pathway outcome as contested, not settled (GW Hatchet, Aug 3 2026; Loudoun Now, Sep 28 2026; Virginia Business, Aug 2026)

On the data center map

Every tracked data center is on this map, centered on Amazon 'Bridgefield' GWU Ashburn Campus. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.
The story of Amazon 'Bridgefield' GWU Ashburn Campus
Announced capex
$427M
Land owner
George Washington University

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterVirginia(338)

The deal

utility
Dominion Energy · Route 28 Tax District
developer
Amazon · purchased GWU campus for $427.3M
land owner
George Washington University · Seller of the 111-acre Virginia Science & Technology Campus to Amazon for $427.3M (closed March 2026); permitted to operate on-site up to 5 years

Power

Power source
grid
Grid operator
PJM
Interconnection

The PJM grid demand right now: 108.6 GW (EIA-930, 2026-10-02 01:00).

County water status: Moderate drought (D1) in Loudoun County, week of 2026-09-29 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Silicon on site

Every AI chip publicly attributed to Amazon 'Bridgefield' GWU Ashburn Campus on the DEPLOY registry. Quantity hints are unstructured because underlying disclosures vary by an order of magnitude. Source links per row.

  1. as of 2024-12-03

    AWS Trainium 2 capacity across the Ashburn / GWU Bridgefield campus

    inferredAWS deploys Trainium 2 across its US-East-1 flagship region; per-campus counts not published.

    AWS

Why here

Amazon 'Bridgefield' GWU Ashburn Campus sits on brownfield in Virginia, Ashburn. It connects to the PJM grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

GWU Virginia Science & Tech Campus land acquisition
$427M. Amazon Data Services purchase of the 111-acre former GWU campus in Ashburn; Amazon to honor GWU operations for up to 5 years before construction journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States

Timeline

  1. Aug 2026
    party added
    land_owner: George Washington University
  2. Oct 2026
    Current: Announced

Sources

e8b1e61f-5ea1-46f1-8667-a4bde94f2409 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Amazon 'Bridgefield' GWU Ashburn Campus?
Amazon 'Bridgefield' GWU Ashburn Campus is an AI data center campus tracked on the DEPLOY registry, located in Ashburn. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Amazon 'Bridgefield' GWU Ashburn Campus?
Amazon is recorded as a party to Amazon 'Bridgefield' GWU Ashburn Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Amazon 'Bridgefield' GWU Ashburn Campus operating yet?
As of the most recent verification on the DEPLOY registry, Amazon 'Bridgefield' GWU Ashburn Campus is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Amazon 'Bridgefield' GWU Ashburn Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Amazon 'Bridgefield' GWU Ashburn Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Amazon 'Bridgefield' GWU Ashburn Campus: AI data center campus record. Retrieved October 2, 2026, from https://registry.deploy.report/datacenters/amazon-gwu-ashburn-loudoun-virginia

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces