AWS Madison County Data Center Campuses is a tracked AI data center campus in Mississippi, Canton. AWS committed in January 2024 to at least $10 billion (later scaled up in company statements toward $25 billion) to build hyperscale data center campuses in Madison County, Mississippi, across the Madison County Mega Sit

Under construction · Amazon Web Services · Private land · MISO · Canton, Mississippi, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Energized
not recorded

Promised online: 2027. 16 months away. Claimed by AWS / Mississippi Development Authority (source).

AWS Madison County Data Center Campuses capacity claims
Source
Under construction0.25 GW2025-06-01claimedtracker

Key facts

0 GW

Energized

Amazon Web Services

Developer

MISO

Grid

On the data center map

Every tracked data center is on this map, centered on AWS Madison County Data Center Campuses. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Amazon Web Services · Owner and operator
operator
Amazon Web Services
utility
Entergy Mississippi · Grid power via new 300MW substation; 650MW renewable deal with Amazon
grid operator
MISO

Power

Power source
grid
Grid operator
MISO
Interconnection
Water
Transitioning to recycled/treated wastewater cooling by 2027; $215M state loan funded wastewater treatment upgrades

Entergy Mississippi 300MW substation, 0.30 GW grid, Energized. New substation to serve Madison County data centers

Amazon-Entergy 616MW carbon-free portfolio (5 solar/wind projects), 0.62 GW solar, Financed. 616MW new carbon-free energy from five renewable projects (~152,000 homes)

The MISO grid demand right now: 83.7 GW (EIA-930, 2026-08-20 06:00).

County water status: No drought in Madison County, week of 2026-08-11 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

AWS Madison County Data Center Campuses sits on private land in Mississippi, Canton. It connects to the MISO grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Total planned Mississippi investment
$25B. Statewide (Madison, Warren, Hinds counties) company filing
Additional Madison County expansion
$11B journalist report
State loan for wastewater treatment infrastructure
$215M. MS state loan for cooling-water/wastewater upgrades journalist report
AWS announced Madison County investment
$10B. Company later signaled scaling toward ~$25B press release

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Investment, workforce and specs

Construction jobs
6,000-7,000 construction workers for the twin campuses source
Permanent jobs
At least 1,000 direct jobs source

Timeline

  1. Aug 2026
    party added
    grid_operator: MISO
  2. Aug 2026
    Current: Under construction

Sources

9876c0be-f7b0-4093-a440-5969b60ca565 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is AWS Madison County Data Center Campuses?
AWS Madison County Data Center Campuses is an AI data center campus tracked on the DEPLOY registry, located in Canton. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building AWS Madison County Data Center Campuses?
Amazon Web Services is recorded as a party to AWS Madison County Data Center Campuses on the DEPLOY registry.
Is AWS Madison County Data Center Campuses operating yet?
As of the most recent verification on the DEPLOY registry, AWS Madison County Data Center Campuses is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on AWS Madison County Data Center Campuses?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track AWS Madison County Data Center Campuses on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). AWS Madison County Data Center Campuses: AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/aws-madison-county-mississippi

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces