Data center campus
Khazna QAJ1 Ajman AI-Optimized Data Center
Khazna QAJ1 Ajman AI-Optimized Data Center is an AI data center campus developed by Khazna Data Centers in Ajman, Ajman. 0.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · Khazna Data Centers · Private land · other · Ajman, Ajman, United Arab Emirates
Capacity: announced vs energized
Announced-to-energized gap: 0.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.10 GW | 2024-10-01 | reported | press release |
| Under construction | 0.10 GW | 2024-10-01 | verified | press release |
Key facts
Lifecycle
Announced
Energized
Khazna Data Centers
Developer
Location
Grid
Land
Announced-to-energized gap
On the data center map
No mappable coordinate is recorded for Khazna QAJ1 Ajman AI-Optimized Data Center yet. Location: Ajman.
The deal
- developer
- Khazna Data Centers · G42 Group subsidiary
- operator
- Khazna Data Centers
- tenant
- Microsoft · Anchor tenant; first 30MW AI deployment phase
- utility
- Etihad Water and Electricity Company (EtihadWE) · Power supply
- construction
- Laing O'Rourke · Main contractor
Power
- Power source
- grid
- Grid operator
- other
- Interconnection
Why here
Khazna QAJ1 Ajman AI-Optimized Data Center sits on private land in Ajman, Ajman. It connects to the other grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Cooling
- Liquid cooling (first certified AI data center with liquid cooling in MENA); Tier III design source
Timeline
- Aug 2026capacity changedunder_construction: unknown to 0.1
- Aug 2026Current: Under construction
Sources
- Khazna Announces the UAE's First AI-Optimized Data Center (G42)
- Khazna QAJ1 Ajman Data Center: Latest Updates (BlackRidge Research)
aca9b61a-c103-4846-824b-97b2eebbb858 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Khazna QAJ1 Ajman AI-Optimized Data Center?
How much power will Khazna QAJ1 Ajman AI-Optimized Data Center use?
Who is building Khazna QAJ1 Ajman AI-Optimized Data Center?
Is Khazna QAJ1 Ajman AI-Optimized Data Center operating yet?
How verified is the data on Khazna QAJ1 Ajman AI-Optimized Data Center?
Deploy Watch
Track Khazna QAJ1 Ajman AI-Optimized Data Center on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Khazna QAJ1 Ajman AI-Optimized Data Center: AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/khazna-qaj1-ajman-ai-data-center
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/khazna-qaj1-ajman-ai-data-center.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/khazna-qaj1-ajman-ai-data-center
- Data documentation: /data
- Query this programmatically: Deploy MCP