Khazna QAJ1 Ajman AI-Optimized Data Center
Khazna QAJ1 Ajman AI-Optimized Data Center is an AI data center campus developed by Khazna Data Centers in Ajman, Ajman. 0.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · Khazna Data Centers · Private land · other · Ajman, Ajman, United Arab Emirates
Capacity: announced vs energized
Announced-to-energized gap: 0.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.10 GW | 2024-10-01 | reported | press release |
| Under construction | 0.10 GW | 2024-10-01 | verified | press release |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Announcement / capacity (company)
- Oct 15 2024 Khazna Data Centers announced a 100 MW AI-optimized data center in Ajman, described as the UAE's first of its kind and the largest in Khazna's portfolio at announcement (Khazna, Oct 15 2024)
- Halls / footprint (company)
- Facility planned at about 100,000 sqm with 20 data halls of 5 MW each, modular energy-efficient design, electricity primarily from Etihad Water and Electricity (EtihadWE) (Khazna, Oct 15 2024)
- Initial schedule (company)
- At announcement Khazna said the site had broken ground and was on track for completion in about 15 months, with operations targeted Q3 2025. Later schedule slips (if any) are not restated in that release (Khazna, Oct 15 2024)
- Uptime Tier III design (company / Uptime)
- Feb 24 2026 Khazna/Uptime Institute announced Tier III Certification of Design Documents for QAJ01 (100 MW IT load, 20 x 5 MW halls), positioned as the first certified AI data center with liquid cooling in MENA once constructed to that design (Khazna / Uptime, Feb 24 2026)
- Cooling / AI readiness (company)
- Design includes advanced liquid cooling for high rack densities and AI training/inference thermal loads while targeting Tier III resilience (Khazna / Uptime, Feb 24 2026)
On the data center map
Every tracked data center is on this map, centered on Khazna QAJ1 Ajman AI-Optimized Data Center. Pan or zoom out to see how close rivals are building.
- Cooling
- liquid cooling (first certified liquid-cooled AI data center in MENA)
- Tenant
- Microsoft
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterAjman(3)
The deal
- developer
- Khazna Data Centers · G42 Group subsidiary
- operator
- Khazna Data Centers
- tenant
- Microsoft · Anchor tenant; first 30MW AI deployment phase
- utility
- Etihad Water and Electricity Company (EtihadWE) · Power supply
- construction
- Laing O'Rourke · Main contractor
- developer
- Khazna Data Centers
Power
- Power source
- grid
- Grid operator
- other
- Interconnection
Silicon on site
Every AI chip publicly attributed to Khazna QAJ1 Ajman AI-Optimized Data Center on the DEPLOY registry. Quantity hints are unstructured because underlying disclosures vary by an order of magnitude. Source links per row.
- as of 2025-03-01
H200/GB200-generation capacity for G42 / UAE AI stack
inferredG42 has committed multi-billion NVIDIA compute; per-campus attribution not published.
Why here
Khazna QAJ1 Ajman AI-Optimized Data Center sits on private land in Ajman, Ajman. It connects to the other grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Cooling
- Liquid cooling (first certified AI data center with liquid cooling in MENA); Tier III design source
Timeline
- Aug 2026capacity changedunder_construction: unknown to 0.1
- Oct 2026Current: Under construction
Sources
- Khazna Announces the UAE's First AI-Optimized Data Center (G42)
- Khazna QAJ1 Ajman Data Center: Latest Updates (BlackRidge Research)
- Khazna Announces the UAE's First AI-Optimized Data Center
- Khazna Awarded Tier III Certification of Design Documents for Ajman Facility
aca9b61a-c103-4846-824b-97b2eebbb858 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Khazna QAJ1 Ajman AI-Optimized Data Center?
How much power will Khazna QAJ1 Ajman AI-Optimized Data Center use?
Who is building Khazna QAJ1 Ajman AI-Optimized Data Center?
Is Khazna QAJ1 Ajman AI-Optimized Data Center operating yet?
How verified is the data on Khazna QAJ1 Ajman AI-Optimized Data Center?
Deploy Watch
Track Khazna QAJ1 Ajman AI-Optimized Data Center on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Khazna QAJ1 Ajman AI-Optimized Data Center: AI data center campus record. Retrieved October 4, 2026, from https://registry.deploy.report/datacenters/khazna-qaj1-ajman-ai-data-center
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/khazna-qaj1-ajman-ai-data-center.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/khazna-qaj1-ajman-ai-data-center
- Data documentation: /data
- Query this programmatically: Deploy MCP