Data center facility
Red Oak campus expansion (buildings 6-8)
Compass Datacenters · Red Oak. Every figure below is individually sourced and dated.
Part of the tracked campus Compass Datacenters Red Oak Campus (DFW III).
- Announced capex
- $300M
- Cooling
- Air-cooled, N+1 redundancy
- Cost per MW
- $833K/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterTexas(606)
The deal
Inherited from campus Compass Datacenters Red Oak Campus (DFW III).
- developer
- Compass Datacenters · Entity Compass Datacenters DFW III, LLC
- utility
- Hilco Electric Cooperative · Grid power provider to the Red Oak (DFW III) campus at 300 Houston School Road; TCEQ Federal Operating Permit O4679
Financial structure
Inherited from campus Compass Datacenters Red Oak Campus (DFW III).
- DFW III expansion (up to 3 additional buildings)
- $300M. Combined construction cost of up to three more facilities announced Sept 2024 journalist report
Investment, workforce and specs
Inherited from campus Compass Datacenters Red Oak Campus (DFW III).
- Cooling
- Air-cooled, N+1 redundancy source
Power
Inherited from campus Compass Datacenters Red Oak Campus (DFW III). Live grid demand and drought overlay only render on the campus page.
- Power source
- grid
- Grid operator
- ERCOT
- Interconnection
- Water
- Closed-loop water-cooling system that is not connected to the city utility line and, per city staff, uses less water annually than a Walmart Supercenter.
Facility record
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: planned
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Red Oak campus expansion (buildings 6-8)?
Who operates Red Oak campus expansion (buildings 6-8)?
Is Red Oak campus expansion (buildings 6-8) operating?
How verified is the data on Red Oak campus expansion (buildings 6-8)?
Deploy Watch
Track Red Oak campus expansion (buildings 6-8) on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Red Oak campus expansion (buildings 6-8): data center facility record. Retrieved September 20, 2026, from https://registry.deploy.report/datacenters/facilities/compass-red-oak-expansion-tx
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/compass-red-oak-expansion-tx.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/compass-red-oak-expansion-tx
- Data documentation: /data
- Query this programmatically: Deploy MCP